Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> federal standards. Any actions that potentially allow a discharge to state waters <br /> I <br /> must have prior approval of the Washington State Department of Ecology. <br /> 1-07.5(4) Air Quality <br /> Delete all of 1-07.5(4) and substitute the following: <br /> I <br /> The Contractor shall comply with all rules of the Puget Sound Clean Air Agency <br /> (PSCAA) (800-552-3565). These rules include PSCAA Regulation I. Excerpts of <br /> Regulation I are included in the Appendix D as it relates to fugitive dust control. The <br /> I <br /> Contractor shall submit a dust control plan including dust control measures for its <br /> activities related to this Contract that may cause dust. This plan shall be submitted <br /> to the Engineer prior to commencing activity at the job site. <br /> I <br /> 1-07.6 Permits and Licenses <br /> Supplement 1-07.6 by adding the following: <br /> A City of Everett business license is required for the Contractor and the Contractor's <br /> ' Subcontractors prior to commencing construction on this Contract. <br /> Contractor shall obtain all necessary permits required by law and the City of Everett. <br /> All general building, electrical, plumbing permits will be issued at no cost to the <br /> I <br /> Contractor. In addition, obtain all required permits for waste disposal sites. Waste <br /> disposal sites shall be in the United States, unless otherwise expressly stated in the <br /> Contract Documents or the City gives prior written approval. <br /> I <br /> This Project has more than one acre of total disturbed area within the project limits <br /> and requires Contractor to apply for Ecology's Construction Stormwater General <br /> Permit. File Notice of Intent with Ecology and develop a Construction Stormwater <br /> Pollution Prevention Plan (SWPPP) prior to beginning construction. Criteria and <br /> I <br /> requirements for developing a SWPPP can be found in Volume II of the 2014 <br /> Ecology Manual. A link to the Manual can be found on the City's web site using the <br /> following URL: <br /> I <br /> https://www.everettwa.govi672/Stormwater-Management-Manual <br /> Obtain a NPDES CONSTRUCTION STORMWATER GENERAL PERMIT from <br /> Ecology since the Project will disturb more than one acre of surface area. <br /> I <br /> DOE website: <br /> http://www.ecy.wa.gov/programsiwq/stormwater/construction/index.html <br /> Contact Ecology to determine if other requirements apply to the Project. <br /> I <br /> NW Region DOE phone: 425-649-7000 <br /> Include all cost incurred for obtaining the CONSTRUCTION STORMWATER <br /> GENERAL PERMIT in appropriate bid item or items as no direct compensation <br /> I <br /> will be made. <br /> 1-07.9 Wages <br /> I <br /> 1-07.9(1) General <br /> Delete the first paragraph of 1-07.9(1) and substitute the following: <br /> This Contract is subject to the minimum wage requirements of RCW 39.12 and to <br /> I <br /> RCW 48.28, as amended or supplemented. Workers shall receive no less than the <br /> prevailing rate of wage. Bidder shall use the Washington State Prevailing Wage <br /> Rates for Snohomish County, effective at the time of bid opening. Bidder is solely <br /> I <br /> responsible to use the schedule in effect at the Bid Opening Date, determine the <br /> appropriate labor classification(s), and use the appropriate and correct prevailing <br /> I <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> I <br /> WO No. UP3398 SP-97 <br />