My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-07.23 Public Convenience and Safety <br /> Delete the last sentence of the first paragraph of 1-07.23 and substitute the following: <br /> Nothing contained in this Contract is intended to create any third-party beneficiary rights <br /> in favor of the public or any individual utilizing the facilities being constructed or improved <br /> under this Contract. <br /> 1-07.23(1) Construction Under Traffic <br /> Supplement 1-07.23(1) by adding the following: <br /> No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 1 <br /> p.m. on a day prior to a holiday or holiday weekend. A holiday weekend is defined <br /> as having a holiday fall on Friday, Saturday, Sunday or Monday. <br /> Provide a uniformed off-duty Police Officer to control traffic in critical situations as <br /> determined by the Engineer.The uniformed officer shall be paid under contract item <br /> "Traffic Control —Off-Duty Police Officer." <br /> Notify the local Fire, Police and Engineering Departments before the beginning of <br /> each phase of construction so that these agencies may re-route their emergency <br /> vehicles around the construction zone. The non-emergency phone number for <br /> Everett Police is 258-2484, for Fire Dispatch is 257-8757, and for Public Works <br /> Engineering is 257-8800. <br /> Notify City of Everett Transit at 425-257-8984 and Community Transit at 425-348- <br /> 7100 of all street closures or delays at least 24 hours in advance to enable rerouting <br /> of buses. <br /> Notify the property owners at least 72 hours in advance to enable them to remove <br /> vehicles parked in the vicinity of Work. Towing vehicles shall be the responsibility of ' <br /> the Contractor and no additional payment will be made. <br /> Further supplement 1-07.23(1) by adding the following: <br /> 1-07.23(1)A General Requirements Traffic <br /> (******) <br /> The following general requirements apply to all Work on the Project: <br /> Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br /> 10.2(2) TRAFFIC CONTROL PLANS. <br /> Refer to 1-08.4(2) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br /> construction constraints resulting from traffic control. <br /> Notify all affected property owners prior to commencing the barricading of <br /> streets, sidewalks and driveways. <br /> All business driveways shall remain open except as necessary to permit curing <br /> of construction materials or for short periods of time as required for <br /> excavations. However, at least one driveway per business shall remain open <br /> to vehicular traffic at all times unless otherwise approved by the Engineer and <br /> affected property owner in writing. <br /> Signs and barricades shall be supplemented by lanterns or flasher units during <br /> the hours of darkness.. <br /> Drivers of motor vehicles used in connection with the construction shall obey <br /> traffic rules posted for such location in the same manner and under the same <br /> restrictions as provided for the drivers of private vehicles. <br /> Conduct the Work. at all time throughout the project, in such a manner as will <br /> obstruct and inconvenience vehicular and pedestrian traffic as little as possible. <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP -108 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.