Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Record information concurrently with the progress of construction. Conceal no work until <br /> 1 the required information is verified and recorded. <br /> 1-08.11(3) Payment <br /> No separate payment shall be made for the preparation of record drawings. All costs <br /> I associated with the preparation of record drawings shall be included in the unit contract <br /> prices of other items in the Contract. <br /> 1-09 MEASUREMENT AND PAYMENT <br /> 1 1-09.1 Measurement of Quantities <br /> Supplement 1-09.1 by adding the following: <br /> I Measurement by the Ton: Where items are specified to be paid for by the ton it will be <br /> the Contractor's responsibility to see that a certified weight ticket is given to the City's <br /> Inspector on the Project at the time of delivery of materials for each truckload delivered. <br /> Pay quantities will be prepared on the basis of certified weight tickets delivered to the <br /> I City's Inspector at time of delivery of materials. Tickets not received by the City's <br /> Inspector on day of delivery will not be honored for payment. <br /> 1-09.3 Scope of Payment <br /> ISupplement 1-09.3 by adding the following: <br /> 1-09.3(1) Schedule of Values <br /> The Contractor shall submit a Schedule of Values in accordance with 1-08.0(1) PRE- <br /> CONSTRUCTION CONFERENCE. If the Project contains Unit Price Work, in whole or <br /> in part, then the Schedule of Values for that portion of the Work shall also be based on <br /> I unit prices. If the Proposal Form calls for a lump sum price, in whole or in part, then the <br /> Schedule of Values shall: reasonably allocate the Contract Sum among the various <br /> portions of the Work; be complete; be organized to include detailed breakdown of each <br /> I major unit of the Work; be organized to correspond to Contractor's schedule: break down <br /> the Contract Sum showing the value assigned to each part of the Work; include an <br /> allowance for profit and Overhead; include Unit Price Work, if and to the extent indicated <br /> on the Proposal Form; be so organized as to facilitate assessment of Work and payment <br /> of Subcontractors; and be balanced. To the greatest extent possible, the breakdown <br /> shall use the same tasks or units as the Contractor's schedule. Contractor shall provide <br /> documentation substantiating iy ihc^ COSI allocation if askew by a is City's Representative. <br /> I Upon acceptance of the Schedule of Values by the City's Representative, it shall be used <br /> as a basis for all requests for payment. <br /> 1-09.4 Equitable Adjustment <br /> ISupplement 1-09.4 by adding the following: <br /> Other means to establish the reasonable cost of the Work not defined by unit prices <br /> include, and is not limited to, 1-09.6 FORCE ACCOUNT, the Schedule of Values, or <br /> Iestimating manuals. <br /> 1-09.4(1) General <br /> (******) <br /> I <br /> The following shall apply in determining the amount of an equitable adjustment of <br /> Contract Sum: <br /> 1. Except as otherwise expressly provided. Contractor will only be paid for costs <br /> I it clearly and convincingly proves it actually and directly incurred, and shall not <br /> include consequential or indirect damages not otherwise expressly permitted <br /> I Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> IWO No. UP3398 SP-129 <br />