My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 2. Because of the Delay described in subsection (A), the Contractor was <br /> forced to suspend or significantly interrupt its performance so that it <br /> was on standby or idled, and the City required the Contractor to be <br /> ready to resume performance on short notice. Extended time of <br /> performance of Work, such as extensions caused by changes, <br /> inefficiencies, or extra Work, does not constitute suspension or111 <br /> significant interruption of performance. <br /> 3. The Contractor could not and did not use resources, including, but not <br /> limited to, labor, equipment, materials and tools, standing by or idled <br /> on this or other project for any Work during the period of Delay; <br /> 4. The Contractor's Overhead costs did not materially vary from its usual <br /> seasonal Overhead costs during the period of Delay; and <br /> 5. The Delay did not cause over absorbed Overhead in the period the <br /> delayed Work was completed. <br /> 1-09.11A(4)A1a Resources I <br /> To demonstrate the Contractor could not and did not use resources, <br /> including, but not limited to, labor, equipment, materials and tools from this <br /> Project for any other work on this or any other project during the period of111 <br /> Delay in accordance with item 3 of 1-09.11A(4)A1 of these Special <br /> Provisions, the Contractor shall: <br /> 1. Affirmatively represent and warrant that it did not perform <br /> substitute Work; <br /> 2. Identify the specific resources that were idled; and <br /> 3. Show that those resources did not, and could not, work on other <br /> contracts or projects during the Delay. <br /> 1-09.11A(4)A1b No Material Variations <br /> To demonstrate the Contractor's Overhead costs did not materially vary <br /> from its usual seasonal Overhead costs during the period of Delay in <br /> accordance with item 4 of 1-09.11A(4)A1 of these Special Provisions, the <br /> Contractor shall; <br /> 1. Affirmatively represent and warrant that the completion of the <br /> subject Work was extended and that such extension prevented <br /> the performance of other work during both the period of Delay <br /> and the later period of time required to complete the extended <br /> Work, <br /> 2. Disclose the details of Contractor generated billings and <br /> Contractor Overhead Costs, as defined in these Special <br /> Provisions, throughout the actual Project performance. The <br /> details of such information should be no less than specific <br /> identification of the sources and amounts of revenue on no <br /> greater than a monthly basis and specific identification of the <br /> types and amounts of Contractor Overhead Costs on no greater <br /> than a monthly basis for the actual Project duration. <br /> 1-09.11A(4)A1c Overabsorbed Overhead <br /> To demonstrate that Contractor did not incur Overabsorbed Overhead in <br /> the period following the Delay, in accordance with item 5 of 1- <br /> 09.11A(4)A1. of these Special Provisions, the Contractor shall: <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-144 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.