Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 4 — BASES <br /> ' 4-04 BALLAST AND CRUSHED SURFACING <br /> 4-04.1 Description <br /> ' Delete the second paragraph of 4-04.1 and substitute the following: <br /> Work shall also consist of placing crushed surfacing stone as driveway maintenance <br /> material and in gravel driveway restoration as shown on the Plans or directed by the <br /> Engineer. The quantity shown in the Proposal is an estimate for the purpose of <br /> establishing a unit price only. Actual quantities will be measured as construction <br /> progresses. The Engineer may require that some or all of the crushed surfacing be <br /> removed because of contamination or to meet final grades. Removal shall be included <br /> with work for"Crushed Surfacing Top Course" or "Crushed Surfacing Base Course." <br /> 4-04.3 Construction Requirements <br /> ' Supplement 4-04.3 by adding the following: <br /> 4-04.3(12) Gravel Driveway Restoration <br /> (******) <br /> Replace existing gravel driveways removed in order to allow construction of the new <br /> improvements as follows: <br /> Restore gravel driveways by placing a minimum of 3-inches of"Crushed Surfacing Base <br /> ' Course" on subgrade compacted to 95 percent standard density in accordance with 2- <br /> 03.3(14)D. <br /> Preparation and compaction of the subgrade shall be included in "Crushed Surfacing <br /> Base Course" with no direct compensation made. <br /> 4-04.3(13) Gravel Driveway Maintenance <br /> (******) <br /> Maintain existing driveway access by providing and placing Crushed Surfacing Base <br /> Course as necessary and directed by Engineer to allow continued access until <br /> completion of final gravel drive restoration. <br /> 4-04.4 Measurement <br /> Delete the first paragraph of 4-04.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measufed as <br /> described in Division B -- Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 4-04.5 Payment <br /> ' Delete all paragraphs in 4-04.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> i <br /> I <br /> Cleveland Avenue Division 4—BASES November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> Work Order No. UP3398 SP-163 <br />