My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 4 — BASES <br /> ' 4-04 BALLAST AND CRUSHED SURFACING <br /> 4-04.1 Description <br /> ' Delete the second paragraph of 4-04.1 and substitute the following: <br /> Work shall also consist of placing crushed surfacing stone as driveway maintenance <br /> material and in gravel driveway restoration as shown on the Plans or directed by the <br /> Engineer. The quantity shown in the Proposal is an estimate for the purpose of <br /> establishing a unit price only. Actual quantities will be measured as construction <br /> progresses. The Engineer may require that some or all of the crushed surfacing be <br /> removed because of contamination or to meet final grades. Removal shall be included <br /> with work for"Crushed Surfacing Top Course" or "Crushed Surfacing Base Course." <br /> 4-04.3 Construction Requirements <br /> ' Supplement 4-04.3 by adding the following: <br /> 4-04.3(12) Gravel Driveway Restoration <br /> (******) <br /> Replace existing gravel driveways removed in order to allow construction of the new <br /> improvements as follows: <br /> Restore gravel driveways by placing a minimum of 3-inches of"Crushed Surfacing Base <br /> ' Course" on subgrade compacted to 95 percent standard density in accordance with 2- <br /> 03.3(14)D. <br /> Preparation and compaction of the subgrade shall be included in "Crushed Surfacing <br /> Base Course" with no direct compensation made. <br /> 4-04.3(13) Gravel Driveway Maintenance <br /> (******) <br /> Maintain existing driveway access by providing and placing Crushed Surfacing Base <br /> Course as necessary and directed by Engineer to allow continued access until <br /> completion of final gravel drive restoration. <br /> 4-04.4 Measurement <br /> Delete the first paragraph of 4-04.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measufed as <br /> described in Division B -- Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 4-04.5 Payment <br /> ' Delete all paragraphs in 4-04.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> i <br /> I <br /> Cleveland Avenue Division 4—BASES November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> Work Order No. UP3398 SP-163 <br />
The URL can be used to link to this page
Your browser does not support the video tag.