My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> trench. Crushed surfacing shall be mixed, placed, spread and shaped in accordance <br /> ' with the requirements of Section 4-04 of the Standard Specifications. <br /> 5-06.3(6) Temporary Pavement Patching <br /> The Contractor shall furnish, place and maintain temporary pavement patching as shown <br /> ' on the Plans and at locations as directed by the Engineer, until such time as a permanent <br /> patch of permanent paving can be made. <br /> Provide a temporary patch as required to reopen roadway during construction as that <br /> ' withstands existing traffic loads and volumes. Options include, and are not limited to, <br /> cold mix asphalt (MC 250), hot mix asphalt (HMA CL '/2", PG 64-22), or secured steel <br /> roadway plates. <br /> ' Provide temporary asphalt patching where roadway or walk is needed for vehicular or <br /> pedestrian traffic, during the construction period, until permanent pavement and <br /> sidewalks can be constructed. <br /> In the event that the temporary surface subsides after the initial placement, apply <br /> additional MC 250 or HMA (as approved by the Engineer) as necessary to maintain the <br /> ' surface. <br /> Stockpile of plant mix and crushed surfacing for temporary patching shall be provided <br /> on the site by the Contractor. <br /> ' Prior to final restoration of the pavement, the Contractor shall be responsible for <br /> removing and disposing of temporary pavement patching materials. <br /> 5-06.3(7) Incidental Pavement Patching <br /> Incidental pavement patching shall be done only at the direction of the Engineer for <br /> patching and restoring areas between the back of new sidewalks and adjacent asphalt <br /> ' driveways, paving ramps at the ends of sidewalks, and gutters that are adjusted to <br /> grade. <br /> Asphalt for incidental pavement patching shall be HMA CL 1/2", PG 64-22. <br /> 5-06.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 5-06.5 Payment <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B— Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> I <br /> I <br /> ' Cleveland Avenue Division 5—SURFACE TREATMENTS November 2018 <br /> Sewer System Replacement and AND PAVEMENTS <br /> Storm Water Separation <br /> Work Order No. UP3398 SP-167 <br />
The URL can be used to link to this page
Your browser does not support the video tag.