My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> rCITY OF EVERETT SPECIAL PROVISIONS <br /> i <br /> INote:Unit prices for all items,all extensions,and the total amount bid must be shown.Where conflict occurs between the <br /> unit price and the total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform <br /> rthereto.All entries must be typed or entered in ink <br /> BID SCHEDULE B— Stormwater and Associated Restoration <br /> Interwest Construction, Inc. <br /> l BIDDER: c , <br /> 1 <br /> Item ITEM DESCRIPTION Unit Bid Qty UNIT PRICE TOTAL AMOUNT <br /> B-1 Force Account $ 50,000 $ 1.00 $ 50,000.00 <br /> B-2 Surveying LS 1 $ 25,000.00 $ 25,000 .00 <br /> LS <br /> B 3 Spill Prevention, Control & 1 $ 600,oo $ 600 ,00 <br /> Countermeasures Plan <br /> I <br /> ii B-4 Mobilization LS 1 $ 31 ,bpi?.b0 $ -310,000 .01D <br /> I B 5 Traffic Control Labor HR 4,000 $ 55.oo $ 220,000.00 <br /> B-6 Maintenance and Protection <br /> of Traffic Control LS 1 $ 22,000.00 $ 22,000,00 <br /> Sawcutting Pavement, <br /> B-7 LF 11,000 $ 3. 00 $ 33,000.00 <br /> Final Joint Cut, Up to 6-Inch <br /> II Sawcutting Pavement, <br /> B-8 Final Joint Cut, LF 2,800 $ 1 .00 $ 2,800,00 <br /> Additional 1-Inch Thickness <br /> B-9 Rncluding Haul oadway Excavation SY 14,000 $ a .00 $ a14,OBD .OQ <br /> I <br /> B-10 Gravel Borrow Including Haul TN 13,700 $ O. 01 $ 137.00 <br /> IIIB-11 Foundation Material TN 2,440 $ 22.00 $ 53,680.00 <br /> IB-12 Street Cleaning and Sweeping HR 480 $ 90 00 $ 43,200 .00 <br /> B-13 Trench Excavation LS 1 $ 4,100. 00 $ 4,100.00 <br /> Safety Systems — <br /> I13-14 Control Density Fill (CDF) CY 100 $ 145.00 $ 14,500.00 <br /> B-15 Crushed Surfacing Top Course TN 270 $ 52. OD $ 14,040. 00 <br /> IB-16 Crushed Surfacing Base Course TN 4,770 $ 31.00 $_ 147,870.00 <br /> { <br /> IB-17 HMA CL 1/2"PG 64-22 TN 2,180 $ I41p.DQ $ 314,at,V . 60 <br /> Cleveland Avenue Division P–PROPOSAL November 2018 <br /> i Sewer System Replacement and <br /> Storm Water Separation <br /> WO No.UP3398 SP-11 <br /> ovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.