Laserfiche WebLink
I <br /> I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> IItem ITEM DESCRIPTION Unit- ' litid Qty UNIT PRICE TOTAL AMOUNT <br /> 4 B-36* Storm Filter System EA 1 $ 20,000, 00 $ 20,000.00 <br /> (Includes Filters) <br /> IB-37 Plugging Existing Pipe EA 21 $ 475.oo $ 9,975. 00 <br /> Temporary Pump <br /> B-38 LS 1 $ 33,000. oo $ 33,000.00 <br /> I Bypass System <br /> Temporary Sediment <br /> B-39 and Erosion Control LS 1 $ 34,000.00 $ 34,000.00 <br /> IB-40 Top Soil Type A CY 100 $ 56.00 $ 5,600.00 <br /> B-41 Sod Installation SY 230 $ 20. 00 $ 4,600. 00 <br /> I Cement Concrete Curb <br /> B 42 and Gutter,Type A 1 LF 2,260 $ 32. oo $ 72,320.00 <br /> i$ <br /> 1, Cement Concrete Sidewalk, <br /> I B-43 Driveway and Alley Approach, SY 40 $ 85.oo $ 3,400 .00 <br /> 6-Inch Thickness <br /> B-44 Survey Monument EA 7 $ 1,950.oo $ 13,650 .00 <br /> 1 B-45 Cement Concrete Sidewalk, SY 1,410 $ 42.00 $ 59,220.00 <br /> 4-Inch Thickness <br /> 1B-46 Cement Concrete Curb Ramp, 22 $ 2,600.00 $ 57,200.00 <br /> Type A or B EA <br /> B 47 Cement Concrete Curb Ramp, EA 10 $ 2,800.00 $ 28,000.00 <br /> TypeCorD <br /> IB-48 Permanent Signing LS 1 $ 3,000,00 $ 3,000 .00 <br /> I B-49 Pavement Marking LS 1 $ 4,000,oo $ 4,000.00 <br /> B-50 Community Project Liaison LS 1 $ 82,000, 00 $ 82,000.00 <br /> (CPL) <br /> I $ 3,. 49,257.n0 <br /> BID SCHEDULE "B"(Stormwater) SUB-TOTAL BID AMOUNT <br /> I <br /> I <br /> I <br /> I Cleveland Avenue Division P—PROPOSAL November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> i WO No. UP3398 SP-15 <br /> I <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />