My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 111 <br /> SUBCONTRACTORS FORM <br /> 1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) <br /> and electrical work(as defined by RCW Chap. 19.28),Bidder MUST either identify itself <br /> or Subcontractors in the chart below. If Bidder believes such work is not part of the scope <br /> of Work,Bidder shall write"NO WORK." <br /> 2. Bidder shall not list more than one Subcontractor for each category of work identified, <br /> unless Subcontractors vary with bid alternates, in which case the Bidder must indicate <br /> which Subcontractor will be used for which alternate. <br /> 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing and electrical work, Bidder <br /> 111 <br /> fails(1)to submit as part of the Bid the names of such Subcontractors, (2)to name <br /> itself to perform such Work, or(3)to write"No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, <br /> plumbing, and electrical subcontractors applies only to proposed heating, ventilation and <br /> air conditioning, plumbing, and electrical subcontractors who will contract directly with <br /> the general contractor submitting the Bid to the City. ' <br /> ARE S_. 4 *.` <br /> t > TYPE/SCOPE 0101' OtK NE DD0 <br /> ORD�K <br /> 174 LITy <br /> HEATING <br /> Subcontractor, bidder or <br /> "no work"MUST be stated NO WORK <br /> VENTILATION AND AIR CONDITIONING <br /> Subcontractor,bidder or <br /> "no work"MUST be stated NO WORK <br /> PLUMBING(as described in RCW Chap. 18.106) <br /> Subcontractor,bidder or <br /> "no work"MUST be stated NO WORK <br /> ELECTRICAL(as described in RCW Chap. 19.28) <br /> Subcontractor, bidder or <br /> "no work"MUST be stated Electric West Inc <br /> i <br /> i <br /> i <br /> Cleveland Avenue Division P—PROPOSAL November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> Work Order No.—UP3398 SP-22 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.