My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> I 10. This Bond is intended to conform to all applicable statutory requirements. Any applicable <br /> requirement of any applicable statute that has been omitted from this Bond shall be deemed to be <br /> included herein as if set forth at length.If any provision of the Bond conflicts with any applicable <br /> I provisionof any applicable statue,then the provision of said statue shall govern and the remainder <br /> of this Bond that is not in conflict therewith shall continue in full force and effect. <br /> I11. The term"bid"as used herein includes a bid,offer or proposal as applicable. <br /> BIDDER SURETY <br /> ITravelers Casualty and Surety <br /> Interwest Construction,Inc. (Seal) Company of America (seal) <br /> ' Bidder's Name and Corporate Seal Surety's Name and.Corporate Seal <br /> By: 1/6Y <br /> Signature,Title,and Date 12/18/18 Signature, 'tie,and.Date 18/18 A.I amb,Attorney-in-Fait <br /> Eben Twaddle, President \ ; - <br /> Attest Attest: �.(. �/�� <br /> Signatur ,Title and Date 12/18/18 Signature,Title and Date Witness 12/18/18 <br /> Rhonda Twaddle, Secretary <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I Cleveland Avenue <br /> Division P—PROPOSAL November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> Work Order No.—UP3398 SP -27 <br /> 11rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.