Laserfiche WebLink
I <br /> The force account item for pothole will only be used at the direction of the Engineer. The <br /> general excavation and locating of utilities along the proposed pipe alignments will be incidental <br /> to the various pipe (sanitary sewer pipe, side sewer services, storm sewer pipe, water main, and <br /> water services) bid items, <br /> Bid Items A-2 and B-2 —SURVEYING <br /> Specification Section 1-05 ' <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid for surveying includes all costs associated with furnishing all labor, tools, I <br /> survey instruments materials, and other equipment necessary for the setting and monitoring the <br /> location, elevation, alignment and grade of the work as specified in Section 1-05.4 of the <br /> Standard Specifications and these Special Provisions and the Drawings. <br /> The lump sum bid item also includes all costs associated with furnishing all labor, tools, survey <br /> instruments, materials and other equipment necessary for verifying the rim and invert111 <br /> elevations, prior to construction, of all existing manholes and pipes where connections are to be <br /> made. <br /> tools, survey <br /> The lump sum also includes all costs associated with furnishing all labor, su ey <br /> instruments, materials and other equipment necessary for obtaining the "as constructed" <br /> location and elevations of the Contract work, in particular, sewer pipe invert elevations and other111 <br /> information necessary for production of the Record Drawing (As-Constructed) documents <br /> meeting the requirements defined in Section 1-08.11 of these Special Provisions. <br /> Measurement for surveying shall be the ratio of actual pipe installed and backfilled to the total <br /> Y 9 pP <br /> quantity of pipe listed in the proposal. <br /> Bid Items A-3 and B-3 — SPILL PREVENTION, CONTROL & COUNTERMEASURES PLAN <br /> Specification Section 1-07 <br /> Measurement and Payment: Lump Sum <br /> This lump sum unit price includes all costs associated with preparing and implementing a <br /> project-specific spill prevention, control, and countermeasures plan (SPCC Plans) in <br /> accordance with Section 1-07.15(1) of the standard specifications <br /> Bid Items A-4 and B-4— MOBILIZATION <br /> Specification Section 1-09 <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid for mobilization shall constitute complete compensation for all preconstruction <br /> costs of preparatory work and operations performed by the Contractor, including, but not limited <br /> to, those necessary for the movement of his personnel, equipment, supplies and incidentals to <br /> Cleveland Avenue Division B—BID ITEM DESCRIPTIONS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-30 1 <br />