Laserfiche WebLink
I <br /> I <br /> I <br /> 1-09 MEASUREMENT AND PAYMENT SP-129 <br /> 1-10 TEMPORARY TRAFFIC CONTROL SP-147 <br /> 1-11 MISCELLANEOUS SP-151 <br /> DIVISION 2—EARTHWORK SP-153 <br /> 2-01 CLEARING,GRUBBING AND ROADSIDE CLEANUP SP-153 <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS SP-153 <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT SP-157 <br /> 2-04 HAUL SP-158 <br /> 2-07 WATERING SP 159 <br /> 2-09 STRUCTURE EXCAVATION SP-160 <br /> 2-11 TRIMMING AND CLEANUP SP-161 <br /> DIVISION 4—BASES SP-163 <br /> 4-04 BALLAST AND CRUSHED SURFACING SP-163 <br /> DIVISION 5—SURFACE TREATMENTS AND PAVEMENTS SP-165 <br /> 5-06 PAVEMENT PATCHING SP-165 <br /> DIVISION 7—DRAINAGE STRUCTURES, STORM SEWERS, <br /> SANITARY SEWERS,WATER MAINS,AND CONDUITS SP-169 <br /> 7-04 STORM SEWERS SP-169 <br /> 7-05 MANHOLES, INLETS,AND CATCH BASINS SP-170 <br /> 7-06 WATER QUALITY TREATMENT STRUCTURES SP-173 <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS SP-179 <br /> 7-17 SANITARY SEWERS SP-182 <br /> 7-18 SIDE SEWERS SP-184 <br /> 7-19 SEWER CLEANOUTS SP-185 <br /> 7-21 TEMPORARY BYPASS PUMPING SP-186 <br /> DIVISION 8—MISCELLANEOUS CONSTRUCTION SP-191 <br /> 8-01 EROSION CONTROL SP-191 <br /> 8-02 ROADSIDE RESTORATION SP-19.5 <br /> 8-04 CURBS, GUTTERS AND SPILLWAYS SP-198 <br /> 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES SP-199 <br /> 8-13 SURVEY MONUMENTS AND CASES SP-200 <br /> 8-14 CEMENT CONCRETE SIDEWALKS SP-202 <br /> 8-21 PERMANENT SIGNING SP-204 <br /> 8-22 PAVEMENT MARKING SP-205 <br /> DIVISION 9—MATERIALS SP-207 <br /> 9-03 AGGREGATES SP-207 <br /> 9-04 JOINTS AND CRACK SEALING MATERIALS SP-207 <br /> 9-05 DRAINAGE STRUCTURES, CULVERTS,AND CONDUITS SP-207 <br /> 9-06 STRUCTURAL STEEL AND RELATED MATERIALS SP-209 <br /> 9-14 EROSION CONTROL AND ROADSIDE PLANTING SP 209 <br /> 9-23 CONCRETE CURING MATERIALS AND ADMIXTURES SP-210 <br /> I <br /> Cleveland Avenue November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP - ii <br /> 1 <br />