I <br /> I <br /> CITY OF EVERETT, WASHINGTON <br /> I DIVISION C — CONTRACT AND BONDS <br /> I CONTRACT <br /> I THIS CONTRACT is made and entered into this s�jth day of 3AoUA42`( , 2019, by and <br /> between the City of Everett, Washington, a municipal corporation existing under the laws of the <br /> State of Washington, hereinafter called the "City," and <br /> I Ii r1E j ST CoNS'TRv L i g , G a <br /> (/,�ASNww.. -(o- Co , hereinafter called the "Contractor." <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees <br /> k to furnish all labor, tools, materials, equipment, and supplies required to build and construct and <br /> to build and construct in a workmanlike manner the work, improvements, and appurtenances in <br /> accordance with the Specifications and Plans entitled: "Cleveland Avenue Sewer System <br /> IReplacement and Storm Water Separation" (the "Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> I reference and are hereby made a part of this Contract: <br /> A. Notice to Contractors <br /> B. Instructions to Bidders (if any) <br /> I C. Washington State Department of Transportation Standard Specifications 2016 as <br /> modified by all amendments thereto as of the date of bid opening of this Project <br /> (`'Standard Specifications"). <br /> ID. Special Provisions <br /> E. Plans, Drawings and Project Specifications <br /> IF. Addenda(if any) <br /> G. Payment Bond and Performance Bond <br /> H. Contractor's Proposal/Bid (conformed copy dated I a'1 a -ao a ) <br /> II. All provisions required by law whether set forth and reproduced herein or not <br /> 2. Time for Completion. Substantial completion shall be achieved within TWO HUNDRED <br /> I (200) working days of the effective date of the Notice to Proceed. Physical completion shall be <br /> within TWENTY (20)working days of the actual date of issuance of substantial completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional <br /> Iexpense in the event that the Contractor does not complete specific work elements that are <br /> associated with Washington State Department of Ecology Grant funding prior to November 25, <br /> 2019. Because it is difficult to accurately compute the amount of such costs and damages, the <br /> I Contractor hereby covenants and agrees to pay to the City liquidated damages as computed in <br /> Section 1-08.9 of the Standard Specifications, for each and every working day required to <br /> accomplish substantial completion of the work in excess of the period established above for <br /> Isubstantial completion.For overruns in contract time occurring after the physical completion date, <br /> I Cleveland Avenue Division C-CONTRACT November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> IWO No. UP3398 SP -51 <br />