My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor shall cooperate with the utility companies and their subcontractors and <br /> so conduct its operations that the necessary construction of their facilities can be <br /> accomplished to the mutual satisfaction of the City of Everett and the utility companies. <br /> Supplement Section 1-05 by adding the following new subsections: <br /> 1-05.16 Water and Power <br /> (******) <br /> The Contractor shall make necessary arrangements, and shall bear the costs for power and <br /> water necessary for the performance of the Work, unless the Contract includes power and <br /> water as a pay item. <br /> Contractor shall pay all power and water costs until Substantial Completion, whether such <br /> power or water is provided by temporary or permanent facilities. City shall not be liable for <br /> any costs or Delays arising out of or caused by the availability or lack of availability of <br /> permanent power or utilities. <br /> 1-05.17 Oral Agreements <br /> (******) <br /> No oral agreement or conversation with any officer, agent, or employee of the City, either <br /> before or after execution of the Contract, shall affect or modify any of the terms or obligations <br /> contained in any of the documents comprising the Contract. Such oral agreement or <br /> conversation shall be considered as unofficial information and in no way binding upon the <br /> City, unless subsequently put in writing and signed by the City. <br /> 1-05.18 Contractor 111 <br /> 1-05.18(1) Contractor's Representative <br /> The Contractor shall notify the Owner in writing of the name of the person who will act <br /> as the Contractor's representative. will have the authority to act in matter relating to this <br /> Contract, and will be delegated with authority to act as the Contractor's emergency <br /> contact. This person shall have authority to carry out the provisions of the Contract and <br /> to supply materials. Equipment, tools and labor without delay for the performance of the <br /> Work. <br /> Contractor shall employ and keep on site on a full time basis personnel experienced in <br /> the management of construction of projects of this size and type. These shall include, <br /> but not be limited to, a project manager al ld superintendent. Neither the Contractor's <br /> tor's <br /> project manager nor the superintendent shall have supervisory responsibility for other <br /> projects for the Contractor while assigned to this Project. Contractor shall employ and <br /> assign such additional, full time office. support and engineering personnel to support the <br /> project manager and superintendent and allow timely completion of the Project. The <br /> project manager and superintendent shall be approved by the City, and such approval <br /> shall not be unreasonably withheld. Contractor shall submit personnel qualifications <br /> within seven (7) days of Contractor's execution of the Contract. Basis for disapproval <br /> include, but are not limited to, lack of sufficient experience managing the construction of <br /> similar type or size projects or relationships on other projects unsatisfactory to the City <br /> or, if the Project is subject to supplemental bidder responsibility criteria and such criteria <br /> contain personnel qualifications, the personnel differ from those named by Bidder in its <br /> pre-Award supplemental bidder responsibility criteria submittals, City may require <br /> removal and replacement of Contractor's supervisory staff who are disruptive or who <br /> appear to lack sufficient competence to complete the Project successfully. <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP -88 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.