Laserfiche WebLink
�l��L��C� <br /> CONSTRUCTION CO., INC. <br /> 223-09 SE-LL-EC-'372N0 <br /> P.O. BOX 9970 <br /> 220 E3TH AVE. N.. SEATTLE. WA SB109-0970 <br /> [206) EB2-7770; TELEX: 952439 <br /> FAX: [206] 823-5206 <br /> June 30, 1988 <br /> City of Everett <br /> Plannine & Construction Permit Department <br /> RE: GENERAL HOSPITAL - M�DICAL OFFICE BOILDING <br /> COST ESTIMATE FOR SIDEWALKS & STORM DRAINAGE <br /> Gentlemen: <br /> The following is tlie cost estimates for the sidewalks and storm <br /> drainage for the Medical Office Building for General Hospital <br /> which is located at 14th and Rockefeller. The sidewallc estimate <br /> is fur the new sidewalks which are next to 14th and c�ithin the <br /> ci�y' ;. ensement, the plazas located between General Hospital <br /> bu:idings are not included. The storm draina�e estim<ite is for <br /> tha catch basins and connecting lines for tkie area wc,st of il�e <br /> Med.ical OPfice Building. <br /> Sidewalks <br /> Curbs 310 Lf $ 2, 1'0. 00 <br /> Sidewalks 900 Sf 1 , 390.00 <br /> Flheelchair Ramps 2 Ea 300 . 00 <br /> 4 , 360 . 00 <br /> Storm Drainage <br /> 4 C.B. & 1 Manhole 15 , 000 . 00 <br /> � 19, 360. 00 <br /> Please call if you have �.ny questio:,s. <br /> � <br /> v// ��.e� <br /> Scott Preenwood <br /> Project Manager <br /> Sellen Construi:�,ion Co. , Inc, trr� <br /> e <br /> '�, -�•� <br /> �� <br />