My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/02/13 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/02/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 9:09:15 AM
Creation date
2/19/2019 9:08:54 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 5 <br /> PROJECT TITLE: <br /> Call for Bids for Construction Briefing COUNCIL BILL# <br /> of the Alverson Stormwater Proposed Action Originating <br /> Separation Project Department Public Works <br /> X Consent Contact Person Arnie Roshak,PE <br /> Action Phone Number 425-257-7249 <br /> First Reading FOR AGENDA OF February 13, 2019 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> Administration <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Northwest Neighborhood Location Map Public Works,Legal <br /> along Alverson and <br /> Grand Ave from 5th to 9th <br /> St and 9th Street from <br /> Rucker to Grand Ave. <br /> Amount Budgeted 2,087,000 <br /> Expenditure Required 2,000 Account Number(s): UP 3660 <br /> Budget Remaining 2,085,000 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Alverson Stormwater Separation Project is Phase 3 of the Northwest Stormwater Separation Project, <br /> which will install a new separated storm drain system in the right-of-way. The project is needed to address <br /> surface and basement flooding and capacity issues with the existing combined sewer system. The new storm <br /> drain network will convey stormwater flow to detention ponds on the Legion Memorial Golf Course <br /> (completed Phase 1 Project). The Alverson project will expand the area to be separated. The initial portion <br /> was installed under Phase 2,the North Wetmore Stormwater Separation project,which is nearing completion <br /> of construction. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Call for Bids for the construction of the Alverson Stormwater Separation Project. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.