Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 5 <br /> PROJECT TITLE: <br /> Call for Bids for Construction Briefing COUNCIL BILL# <br /> of the Alverson Stormwater Proposed Action Originating <br /> Separation Project Department Public Works <br /> X Consent Contact Person Arnie Roshak,PE <br /> Action Phone Number 425-257-7249 <br /> First Reading FOR AGENDA OF February 13, 2019 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> Administration <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Northwest Neighborhood Location Map Public Works,Legal <br /> along Alverson and <br /> Grand Ave from 5th to 9th <br /> St and 9th Street from <br /> Rucker to Grand Ave. <br /> Amount Budgeted 2,087,000 <br /> Expenditure Required 2,000 Account Number(s): UP 3660 <br /> Budget Remaining 2,085,000 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Alverson Stormwater Separation Project is Phase 3 of the Northwest Stormwater Separation Project, <br /> which will install a new separated storm drain system in the right-of-way. The project is needed to address <br /> surface and basement flooding and capacity issues with the existing combined sewer system. The new storm <br /> drain network will convey stormwater flow to detention ponds on the Legion Memorial Golf Course <br /> (completed Phase 1 Project). The Alverson project will expand the area to be separated. The initial portion <br /> was installed under Phase 2,the North Wetmore Stormwater Separation project,which is nearing completion <br /> of construction. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Call for Bids for the construction of the Alverson Stormwater Separation Project. <br /> 15 <br />