My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/02/20 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/02/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2019 9:24:56 AM
Creation date
2/21/2019 9:24:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/20/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Northe Truck Equipme t Inca <br /> 14919-40th Ave.N.E. <br /> Marysville,WA 98271 ', <br /> Ph:360-653-6066 Fax:360-653-0100 <br /> 1400-653-6066 <br /> wwwmorthendtruck.com <br /> Steel Angle Iron On Top Of The Side Boards with <br /> 166 55 45deg.Rear Caps For Clearance , 1 $625.00 $625.00 <br /> 172 61 Cone Holder Installed(City Spec)(Each) 1 $225.00 $225.00 <br /> NTE Basic Hydraulic's and Options <br /> ' Closed Center Snow and Ice System Multi Section <br /> Valve With 5100EX Electric Sander Valve Control and <br /> Stainless Box(Room Permitting)With Load Sense <br /> Pump Front Mounted With OEM Front Frame Rail <br /> Extensions,Air Control Console,Behind The Cab Tank, <br /> or VT35 with Poly Or Stainless Lid,With Basic Hoses 1 $19 700.00 $19,700.00 <br /> 6 3 and Fittings Installed(See Sander Line Option) $19,700.00 <br /> Deduct for Gear driven Pump In Lieu of Load Sense 1 -$900.00 -$900.00 <br /> k. <br /> 16 13 NE-12 Prewet Valve and Feedback Harness Kit 1 $1,189.00 $1,189.00 <br /> 21 18 Sander Lines To The Rear With QD's 1 $1,344.00 $1,344.00 <br /> NE-19E DLA!Anti-lcing.3-Lane Harness Kit to Add to 1 $822.00 $822.00 <br /> 43 21 5100ex-3 Harnessing(Flow Meter Feedback Incl.) <br /> 55 3 Hot Shift PTO I.L.O.Manual Transmission For Allison 1 $1,695.00 $1,695.00 <br /> Plow Category 6:Snow Plow Reversible <br /> 36 10 Shorten Front Frame Rails <br /> 1 $188.00 $188.00 <br /> NTE Quick Hitch(Must Have Extended Full Front 1 $4,246.00 $4,246.00 <br /> 37 11 Frame Rails(Not Bolt On)and Stationary Grill) <br /> Alternate Options <br /> City Spec gimble mounted beacon brand w/guards,(2) <br /> Whelen LED PN:31HAF w/branch guard PN: 1 $1,153.00 $1,153.00 <br /> • L360BGB <br /> City Spec lighting at the rear of the Inti-Ice Tank wired <br /> to j-box includes two(2)each Whelen M4A strobes <br /> mounted to T-P bracket with material shed plate over <br /> top and one(1)Truck*Lite 80396 work light.Include 1 $1,045.00 $1,045.00 <br /> City Spec'ed wire harness and plug NC <br /> City Spec Tail gate chains I NC <br /> City spec back-up alarm brand 1 $190.55 $190.55 <br /> City Spec wire plugs,molded one piece plugs <br /> 1 $83.00 $83.00 <br /> Dept.request Aluminum installed front of body <br /> I $888.00 $888..40 <br /> Dept.request remove rear hitch,plug and wiring 1 -$673.00 -$673.00 <br /> 2of3 <br /> 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.