Laserfiche WebLink
. 4. R <br /> t <br /> Northend o Price Quotation For: PQ#121318EV <br /> pment Inc. <br /> 14919-40th Ave.N.E. 714 7-17r---1 <br /> Marysville,WA <br /> 98271 .: <br /> - <br /> 3-6066 Fax: 360-653-0100 , <br /> Ph: 360 65 �. gip"y� --� <br /> 1-800-653-6066 <br /> Www.nc t hendtruck.com 1/2/2019 <br /> Tony Cadeinarti State of Washington Current Contract Information <br /> City of Everett Effective Date: 5/1/2018 <br /> Maintenance and Operations Supervisor Contract number: 01117 <br /> 425-446-2784 Contract title:Dump Bodies,Snow Plows Various Types, <br /> Tcademarti .everethwa.aov <br /> Excel# Item# Description Qty Unit Price .Total Prrice <br /> Category A: Hopper Sander;5-10 Yard with Pre-wet <br /> Monroe,MCV-141-84-56, 12'-WA,AUS, 12/10 GA V- <br /> BOX SANDER Meets or Exceeds Specifications <br /> Section I, 1-8,Section II, 1-11, Section 111, 1-19,Section 1 $27,824.00 $27,824.00 <br /> 66 N, 1-18 <br /> Tailgate latch bar bolted to the longsill at the rear for <br /> securing to the body with the truck tailgate latch system. 1 $565.00. $565.00 <br /> 77 7 Material to be stainless. <br /> Do,house with sloped front.Depending on hopper and <br /> dump body combination an optional dog house cutout 1 $1,056.00 $1,056.00 <br /> 79 9 with a sloped front must be available. <br /> 87 17 Deduct for light bar and airfoil 1 -$1,300.00 -$1,300.00 <br /> Hydraulic closed loop prewet pump The pre-wet system <br /> shall have a hydraulic motor driven 7 GPM bronze gear <br /> pump with an internal liquid product bypass. Option <br /> requires additional hydraulic control function in main 1 $1,725.00 $1,725.00 <br /> 90 20 control valve assembly. <br /> - Install Anti Ice Unit with all controlls to be compatible 1 $3,842.00 $3,842.00 <br /> 145 10 with the Force America 5100EX <br /> Category C:3,5,and 10 yard Contractor Body ` , <br /> Contractor Dump Bodies 7/9 cu.Yd.(Northend Truck <br /> Equip) (Length 156",Width 96")Meets or Exceeds <br /> Specifications Section I, 1-8, Section II, 1-23,Section <br /> III, 1-18,Section IV, 1-3,Section V,Item 1,Section VI, <br /> 1-6, Section VII, 1-5,Section VIII,Item 1 and section 1 $28,967.00 $28,967.00 <br /> 82 IX,Item 1 <br /> Steel Tool Box 18 x 18 x 24,CA Room Permitting <br /> I $564.00 $564:00 <br /> 99 15 (Installed) <br /> $1.,1.94.00 <br /> .00 <br /> 194 <br /> 124 13 _3116"A13 Dash and Tailgate(All Bodies) 1 I $1,,194.0000 $680.00 <br /> 126 15 1/4"AR Floor For 10/12 Yd.Body <br /> I of 4 le4381 <br /> 41 " <br />