Laserfiche WebLink
Run Date: 7/2/2018 City.of Everett-Public.Works Department Cutoff Date: 6/29/2018 <br /> Time: 1:54 PM Contract'Estimate•Voucher <br /> Project: 366 For Work Order#5602 Contractor: STELLAR 4 CORPORATION <br /> PORTAL 1 REPLACEMENT • Estimate.#5 1363 DOWN RIVER.DRIVE <br /> WO8602 BID:.$705,307.57 WOODLAND,WA•98674 <br />. TOTAL BID:$763,216:34 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price. Quantity Quantity Quantify Quantity Amoelnt Amount Amount <br /> 0001 BASE BID.' LS 696;696,00 1.00' 1.0000 .0;9046 '0,0954 698,696:00: 630,231.20 66,464.80. <br /> 0002 TRENCH SAFETY SY$,DEPTHS•OVER:4' LS 1,000,00 1,00 1.0000 1.0000 '0.0000 1.,000;00 1,000'00 0.00 • <br />• <br />• 0003 WGD=001 ADDED PIPE ADAPTER LS 4;862:93 T.00. 1,0000 0.0000 1.:.0000 4,852,93 0.00 4,862•,93 <br /> •0004 WCD-002 REPAIR HOLES IN•EXISTIN(3'PIM' LS 2,748.64 1,00 1,0000. 0,0000 1.0000 2,748:6.4• 0,00 2,748.:64 <br /> I Work Ostler Totals:• 705,307:•57 631,231.20• 74,076'.37 <br /> n <br /> i cc <br /> • . <br /> • <br /> • <br /> • . <br /> . <br /> • . <br /> • <br /> • . <br /> e <br />