My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GeoEngineers 2/22/2019 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2021
>
GeoEngineers 2/22/2019 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 9:33:45 AM
Creation date
2/28/2019 9:33:41 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
GeoEngineers
Approval Date
2/22/2019
End Date
12/31/2021
Department
Facilities
Department Project Manager
Mike Palacios
Subject / Project Title
Smith Street Mill Clean-up
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$192,789.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 5 <br /> 2. COST ESTIMATE(TIME AND MATERIALS): <br /> Description Estimate <br /> Professional Labor <br /> Data Gaps Assessment $7,041 <br /> Environmental Cleanup Plans and Specifications and Contractor Procurement Support $13,496 <br /> Cleanup Construction Observation (sampling, compliance monitoring, reporting) $37,221 <br /> Inspection and Maintenance Plan for Parking Lot $5,819 <br /> Regulatory Support $13,144 <br /> Subtotal Labor Estimate $76,721 <br /> Reimbursables <br /> GeoEngineers Equipment and Mileage $3,000 <br /> Subcontracted Utility Locate, Data Gaps Backhoe, Drilling $15,295 <br /> Subcontracted Chemical Analysis(Estimated Placeholder) $59,225 <br /> Subtotal Reimbursables $77,510 <br /> 25%Contingency $38,558 <br /> Grand Total $192,789 <br /> 3. CHANGE ORDER/CHANGES: (To be completed, initialed and dated by Project Engineer and <br /> GeoEngineers prior to work being performed) <br /> 4. SCHEDULE: We anticipate the services outlined under this scope of work will extend over approximately <br /> 28 to 30 months from authorization to completion of compliance groundwater monitoring. <br /> 5. TERMS AND CONDITIONS AND HOURLY BILLING RATES ARE INCLUDED AS EXHIBIT B. <br /> 6. ACCEPTED: <br /> City of Everett GeoEngineers by Dana Carlisle, Principal <br /> 02/06/19 <br /> Date Date <br /> GeoEngineers,Inc. <br /> File No.0661-108-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.