Laserfiche WebLink
Project: Wetmore Avenue Stormwater Bypass Project <br /> Change Order No.3 <br /> Change Order Effective Date: January 14, 2019 <br /> CONTRACTOR <br /> e/„._ <br /> 2A- <br /> By Date: 1/1511 1 <br /> Officer <br /> Exhibit A - Description of Changed Work <br /> This Change Order No. 3 modifies two existing bid items to the Contract as shown below. <br /> Modified Bid Items <br /> Bid Item #A-2 —Traffic Control Labor. Modify Bid Item#A-2 entitled, "Traffic Control Labor" at <br /> the unit Contract price of$66.00/hour, by adding 110 hours to the Contract, resulting in a$7,260.00 <br /> increase to the Contract price. <br /> Bid Item #A-29—Topsoil and Seeding. Modify Bid Item#A-29 entitled, "Topsoil and Seeding" at <br /> the unit Contract price of$30.00/SY, by adding 80 square yards to the Contract, resulting in a <br /> $2,400.00 increase to the Contract price. <br /> JUSTIFICATION <br /> Bid Item#A-2—Traffic Control Labor. This bid item overran plan quantity and is being modified <br /> to account for costs for additional traffic control labor quantities. <br /> Bid Item #A-29—Topsoil and Seeding. This bid item overran plan quantity and is being modified to <br /> account for costs for additional topsoil and seeding quantities. <br /> Total Cost of Change Order No. 3: $9,660.00 <br /> Contract Time: There is no adjustment to Contract time in Change Order No. 3. <br /> Page 3 of 3 <br />