My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2623 VIEWCREST AVE CLEARWIRE ANTENNA 2018-01-01 MF Import
>
Address Records
>
VIEWCREST AVE
>
2623
>
CLEARWIRE ANTENNA
>
2623 VIEWCREST AVE CLEARWIRE ANTENNA 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 11:50:43 AM
Creation date
3/4/2019 11:49:50 AM
Metadata
Fields
Template:
Address Document
Street Name
VIEWCREST AVE
Street Number
2623
Tenant Name
CLEARWIRE ANTENNA
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> INTRODUCTION <br /> Hatfield & Dawson Consulting Engineers h�s been retained by Cleanvire, LLC ("Clearwire") to <br /> eval��ate the proposed Cleanvire wireless broadband telecommunications "View Crest Pole" <br /> tacility, number WA-SN0200•B, for compliance with curent Federsl Communications <br /> Commission (FCC) and local rules regarding pubiic exposure lo radioirequency (RF) <br /> electron�agnetic(ieids (EMFs). <br /> Site plan, elevation and antenna-mounting drawings farnished by Clearwire representatives show <br /> that thc, proposed Cleanvire (aciiiry will be configured as (ollows: three panel antennas, all to be <br /> (lush-mounted on an exlended 56-(oot tall SNO-PUD utilily pole adjacent to 2623 View Crest Ave, <br /> Everetl, in Snoliomish County, Washington. <br /> The new Clearw�ire ant�nnas will be mounled and centered on the pole at approxirr,ately the 48- <br /> foot level. The utility pole is shown without climbing appurtenances. The pole supports high- <br /> vol;age electricai utility lines below the level oi lhe proposed Clearwire antennas. Thus it is <br /> unlikely thai anyone other than authorized RF workers could approach near enough to any of <br /> the proposed antennas to cause that person's RF exposure tu exceed FCC limits. <br /> The following analysis w'll consider the efiects oi the proposed Ciearwire facility on the AF <br /> exposure environment. It is expected that RF exposure conditions near ground Ievel at the View <br /> Crest Pole site, and on all adjacenl properties, due to the contributions irom all transmitting <br /> antennas on ihe 56-ioot utility pole will be well below the FCC public exposure limit. <br /> To verify that the proposed Cleanvire facility will be in compliance with FCC and local rules <br /> regarding public exposure to RF fields, I have performed EMF pow2r density calculations to <br /> delermine ihe exposure condilions thdt are likely to exist in areas near the proposed tacility. <br /> I <br /> I latlicl�l fi Da�cson Can�ultimt Lnginccrs <br /> � <br /> ��6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.