My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5725 HIGHWAY PL 2019-03-06
>
Address Records
>
HIGHWAY PL
>
5725
>
5725 HIGHWAY PL 2019-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 8:17:39 AM
Creation date
3/6/2019 8:17:06 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHWAY PL
Street Number
5725
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICtIORKS PERMIT pate: 1/14/2016 <br /> 4SP" Public Works Permit#: PW1601-014 <br /> City of Everett Public Works Department Parent Permit#: C1510-015 <br /> �.. <br /> kg ., r 3200 Cedar Street <br /> Everett, WA 98201 Planning Reference#: SEPA15-007 <br /> (425) 257-8810 <br /> Public Works Fee$: $ 65.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> KULAGA AHMET& SEVALA KULAGA AHMET <br /> 1205 130TH STS E 1205 130th St SE#A <br /> EVERETT WA 98208 EVERETT WA 98208 <br /> PHONE: PHONE: 4255016441 <br /> TAX PARCEL ID# 00393200102400 SITE ADDRESS: 5725 HIGHWAY PL <br /> PW FOR NEW TOWNHOUSE-UNIT 8 OF 9 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works <br /> Department dated 12/29/2015. w <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior <br /> to starting construction and with all other inspection requests. See attached to request H <br /> an inspection. <br /> 6. No dirt, mud, rocks, or debris to be tracked onto roadway. Keep City streets clean at cip <br /> all times. PP <br /> Public Works Permit Fee Breakdown: C <br /> Driveway$25.00 h <br /> PW Plan Review$20.00 _ 4 <br /> PW Slte Inspection$20.00 SS 11.J 0 <br /> APR 15 2015 <br /> r <br /> C <br /> CITY OF EVERETT <br /> Permit Services <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> `� �� / City of Everett from any and all claims for damages,costs,expenses,or <br /> _;�_ ter, -�.:�di i '40 20 _ causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> . .ved for Cons''�lon !ate remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed SigAtz,461544 <br /> of Applicant ate <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.