Laserfiche WebLink
1. All power lines carrying a voltage of less than 15 kV must be undergrounded. <br /> Section 7: ENVIRONMENTAL HEALTH <br /> 7.1 NOISE <br /> All development in Everett must be in conformance with the requirements of EMC 20.08,the Noise <br /> Control Ordinance. Noise studies may be required to determine if a proposal is in conformance with the <br /> ordinance. <br /> 7.2 TOXICIHAZARDOUS MATERIALS AND EXPLOSIVES <br /> 7.2.3 Mitigation Measures <br /> Construction Phase <br /> 1. Construction equipment and vehicles must be maintained so they do not leak fuels or lubricants. <br /> During construction,a staging area must be specified for all vehicle maintenance activities. The <br /> staging area must be located well away from all drainage courses. Where possible,all stormwater <br /> from related maintenance areas must be directed to the sanitary sewer, rather than the stormwater <br /> system. <br /> 2. During construction activities,all spills of fuel and hazardous materials must be contained and <br /> removed in such a manner as to prevent their entering the waters and soils of the State. Cleanup of <br /> spills must take precedence over other work on site. <br /> 3. During construction,all petroleum products,chemicals, and building materials that could contaminate <br /> runoff must be stored in a lined covered area. An impervious berm must be constructed around the <br /> perimeter of the storage area. The storage area must be located away from environmentally <br /> sensitive areas. <br /> 4. In order to expedite plan review, a hazardous materials inventory list shall be provided as a part of the <br /> submittal for building permits. The storage, handling and use of hazardous materials must be in <br /> compliance with Article 80 of the Uniform Fire Code, 1991 Edition. <br /> Operation Phase • <br /> 5. Dumpsters must be covered and maintained, so that stormwater runoff from refuse does not enter <br /> storm drains or infiltrate into soil. <br /> • <br /> 6. On sites containing hazardous materials, procedures to use in c9se of spills must be posted. <br /> 7. All chemicals or products of a hazardous or toxic nature that may be used or stored on the site must <br /> be stored under cover and isolated from the storm drainage system. <br /> Section 8: PUBLIC SERVICES AND UTILITIES <br /> 8.2 POLICE <br /> 8.2.3 Mitigation Measures <br /> 1. All developments must provide adequate lighting of parking lots and others areas which have an <br /> increased risk for crime. Illumination should be a minimum of 3-4 foot candles. (The City of Everett <br /> Zoning Code requires that all parking lots with more than 10 spaces provide security lighting. Lighting <br /> must be shielded in a manner that does not disturb residential uses.) (SEPA Public Services and <br /> Land and Shoreline Use Policies) <br /> ei3 <br />