My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC 2019-07-08
>
Address Records
>
13TH ST
>
1815
>
SEATTLE CHILDRENS NORTH CLINIC
>
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC 2019-07-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 8:01:43 AM
Creation date
3/7/2019 1:09:49 PM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1815
Tenant Name
SEATTLE CHILDRENS NORTH CLINIC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
664
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTRAL UTILITY PLANT PARKING LOT Everett,Washington <br /> APPENDIX D <br /> REPORT LIMITATIONS AND GUIDELINES FOR USE± <br /> This appendix provides information to help you manage your risks with respect to the use of this <br /> report. <br /> Geotechnical Services Are Performed for Specific Purposes, Persons and Projects <br /> This report has been prepared for the exclusive use of Providence Regional Medical Center and the <br /> project team members for the proposed Central Utility Plant parking lot in Everett, Washington. <br /> This report is not intended for use by others,and the information contained herein is not applicable <br /> to other sites. <br /> GeoEngineers structures our services to meet the specific needs of our clients. For example, a <br /> geotechnical or geologic study conducted for a civil engineer or architect may not fulfill the needs <br /> of a construction contractor or even another civil engineer or architect that are involved in the <br /> same project. Because each geotechnical or geologic study is unique, each geotechnical <br /> engineering or geologic report is unique, prepared solely for the specific client and project site. <br /> Our report is prepared for the exclusive use of our Client. No other party may rely on the product of <br /> our services unless we agree in advance to such reliance in writing. This is to provide our firm with <br /> reasonable protection against open-ended liability claims by third parties with whom there would <br /> otherwise be no contractual limits to their actions. Within the limitations of scope, schedules and <br /> budget, our services have been executed in accordance with our Agreement with the Client and <br /> generally accepted geotechnical practices in this area at the time this report was prepared. <br /> This report should not be applied for any purpose or project except the one originally contemplated. <br /> A Geotechnical Engineering or Geologic Report Is Based on a Unique Set of <br /> Project-specific Factors <br /> This report has been prepared for the proposed Central Utility Plant parking lot in <br /> Everett,Washington. GeoEngineers considered a number of unique, project-specific factors when <br /> establishing the scope of services for this project and report. Unless GeoEngineers specifically <br /> indicates otherwise, do not rely on this report if it was: <br /> ■ not prepared for you, <br /> • not prepared for your project, <br /> • not prepared for the specific site explored,or <br /> • completed before important project changes were made. <br /> 1 Developed based on material provided by ASFE,Professional Firms Practicing in the Geosciences;www.asfe.org. <br /> GEOENGINEERS October 17,2012 Page D-1 <br /> File No.10738-010-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.