My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC 2019-07-08
>
Address Records
>
13TH ST
>
1815
>
SEATTLE CHILDRENS NORTH CLINIC
>
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC 2019-07-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 8:01:43 AM
Creation date
3/7/2019 1:09:49 PM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1815
Tenant Name
SEATTLE CHILDRENS NORTH CLINIC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
664
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAGNUSSON <br /> KLEMENCIC <br /> ASSOCIATES ■ <br /> Table 1. Existing and Proposed Impervious Surfaces <br /> Impervious Surface Area(square feet) <br /> Existing 64,695 <br /> Proposed 264,202 <br /> Interim Policy <br /> The project will discharge to the public combined sewer system (is within the combined sewer area) and <br /> creates and/or redevelops more than 2,000 square feet of impervious area, so the "Public Works Interim <br /> Policy 2-1 1: Stormwater Control in the Combined Sewer Area" (Interim Policy) will apply. See Appendix <br /> C for a copy of the Interim Policy. <br /> According to the Interim Policy, the project will be required to consider all Minimum Requirements with <br /> the following exceptions: <br /> • Minimum Requirement#6 is not applicable; <br /> • Minimum Requirement#7 can now be assessed replacing the term "a forested land cover" with "the <br /> existing site conditions." <br /> After the application of Minimum Requirement#7,the resulting stormwater flow is not anticipated to <br /> increase the Combined Sewer Overflows (CSOs) or the basement flooding in the combined sewer area. <br /> MINIMUM REQUIREMENTS <br /> The Minimum Requirements are summarized in Table 2 with further explanation of actions required <br /> provided where noted. Based on the threshold assessment above, all Minimum Requirements will apply <br /> to the project with the exception of Minimum Requirement#6. <br /> Table 2. Minimum Requirement Summary <br /> Minimum <br /> Requirement# Description Action Required Notes <br /> 1 Stormwater Site Plan Preparation Yes See below <br /> 2 Construction Stormwater Yes See IV Construction <br /> Pollution Prevention Stormwater Pollution <br /> Prevention Plan <br /> 3 Source Control of Pollution No See V Source Control <br /> Plan <br /> 4 Natural Drainage Systems and No See below <br /> Outfalls Preservation <br /> 5 On-Site Stormwater Yes See below <br /> Management <br /> Storm Drainage Report <br /> 4 <br /> Providence Regional Medical Center Everett North Site, Everett,Washington <br />
The URL can be used to link to this page
Your browser does not support the video tag.