Laserfiche WebLink
MAGNUSSON <br /> KLEMENCIC <br /> ASSOCIATES .�■ <br /> project will disturb more than 1 acre of land and so is required to prepare a CSWPPP as part of this <br /> requirement. <br /> The DOE does not require coverage under the General Permit or the preparation of a CSWPPP for <br /> systems discharging to combined sewer; per the DOE's Construction Stormwater General Permit Special <br /> Condition S1.B.2.a, operators of construction activities that discharge to a combined sewer are exempt <br /> from these requirements. With this in mind, the North Site project proposes a "modified" CSWPPP, <br /> specifically addressing the BMPs applicable and appropriate for discharging to the combined sewer. <br /> With no contractor currently engaged on the project, a framework for the project's CSWPPP has been <br /> included in Appendix E. It is understood that the contractor will ultimately be responsible for the final <br /> preparation of the CSWPPP and implementation of the measures outlined in this document. Once on <br /> board, they will work to edit this framework based on their proposed sequencing as well as their <br /> preferred means and methods for construction. <br /> V_.__ SOURCE CONTROL PLAN <br /> The Activity Worksheet has been reviewed (Figure 1.1 in Volume IV, Chapter 2, of the COESWMM) and <br /> it is confirmed that there are no point sources of pollution on the site that could affect the stormwater <br /> drainage system. Therefore, Minimum Requirement#3: Source Control of Pollution is met with no <br /> action required. <br /> VI. SPECIAL REPORTS AND/OR STUDIES <br /> Existing soil types are described in the project geotechnical investigation prepared by GeoEngineers titled <br /> "Geotechnical Engineering Design Report, Central Utility Plant West Parking Lot, Everett Washington for <br /> Providence Regional Medical Center," dated April 22, 2016. A copy of this report is included in <br /> Appendix B.1. This current report summarizes and updates the recommendations provided in the <br /> previous report titled "Geotechnical Design Services, Central Utility Plant Parking Lot, Everett Washington <br /> for Providence Regional Medical Center," dated October 17, 2012, which was prepared by <br /> GeoEngineers for the CUP Parking project completed in 2013. This second report has been included in <br /> Appendix B.2, as it addresses items such as infiltration rates for the site, which are not re-summarized in <br /> the current report. <br /> VII. OTHER PERMITS <br /> Table 3 summarizes the other regulatory permits and requirements to be considered, as listed in <br /> Appendix A of the COESWMM. <br /> Table 3. Regulatory Permits <br /> Permit Description Applicability <br /> Storm Drainage Report <br /> 7 <br /> Providence Regional Medical Center Everett North Site, Everett, Washington <br />