Laserfiche WebLink
• <br /> Geotechnical Engineering Evaluation NGA File No. 1008917 <br /> Cooley Smiles Commercial Development October 3,2017 <br /> Everett,Washington Page 14 <br /> three-percent fines),granular material placed along the back of walls. Washed rock is an acceptable drain <br /> material, or drainage composite may be used instead. The free-draining material or the drainage <br /> composite should extend up the wall to one foot below the finished surface. The top foot of backfill <br /> should consist of low permeability soil placed over plastic sheeting or building paper to minimize the <br /> migration of surface water or silt into the footing drain. Footing drains should discharge into tightlines <br /> leading to an appropriate collection and discharge point with convenient cleanouts to prolong the useful <br /> life of the drains. Roof drains should not be connected to wall or footing drains. <br /> CONSTRUCTION MONITORING <br /> We should be retained to provide construction monitoring services during the earthwork phase of the <br /> project to evaluate subgrade conditions, temporary cut conditions, fill compaction, and drainage system <br /> installation. <br /> USE OF THIS REPORT <br /> NGA has prepared this report for Mr. Brandon Cooley and his agents, for use in the planning and design <br /> of the proposed development on this site only. The scope of our work does not include services related to <br /> construction safety precautions and our recommendations are not intended to direct the contractors' <br /> methods, techniques, sequences, or procedures, except as specifically described in our report for <br /> consideration in design. There are possible variations in subsurface conditions between the explorations <br /> and also with time. Our report, conclusions, and interpretations should not be construed as a warranty of <br /> subsurface conditions. A contingency for unanticipated conditions should be included in the budget and <br /> schedule. <br /> We recommend that NGA be retained to provide monitoring and consultation services during <br /> construction to confirm that the conditions encountered are consistent with those indicated by the <br /> explorations, to provide recommendations for design changes should the conditions revealed during the <br /> work differ from those anticipated, and to evaluate whether or not earthwork and foundation installation <br /> activities comply with contract plans and specifications. We should be contacted a minimum of one week <br /> prior to construction activities and could attend pre-construction meetings if requested. <br /> Within the limitations of scope, schedule, and budget, our services have been performed in accordance <br /> with generally accepted geotechnical engineering practices in effect in this area at the time this report was <br /> prepared. No other warranty,expressed or implied,is made. Our observations, findings, and opinions are <br /> a means to identify and reduce the inherent risks to the owner. <br /> o-o-o <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />