My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10627 19TH AVE SE COOLEY SMILES DENTISTRY 2019-03-18
>
Address Records
>
19TH AVE SE
>
10627
>
COOLEY SMILES DENTISTRY
>
10627 19TH AVE SE COOLEY SMILES DENTISTRY 2019-03-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2019 8:51:29 AM
Creation date
3/7/2019 4:55:59 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10627
Tenant Name
COOLEY SMILES DENTISTRY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cooley Smiles Dental Clinic 17318.20 October 18,2017 <br /> Drainage Report Section V,Page 3 <br /> Concrete Handling(BMP C151) <br /> Sawcutting and Surfacing Pollution Prevention (BMP C152) <br /> Material Delivery,Storage and Containment (BMP C153) <br /> Element 10:Control Dewatering <br /> De-watering is not anticipated. <br /> Element 11: Maintain BMPs <br /> All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as <br /> needed to ensure continued performance of their intended function. <br /> Element 12: Manage the Project <br /> • Phase development projects to the maximum degree practicable and consider seasonal work <br /> limits. <br /> • Inspection and monitoring—Inspect, maintain, and repair all BMPs as needed to assure <br /> continued performance of their intended function. Conduct site inspections and monitoring in <br /> accordance with the Construction Stormwater General Permit or local plan approval authority. <br /> • Maintain an Updated Construction SWPPP <br /> - This SWPPP shall be retained on-site or within reasonable access to the site. <br /> - The SWPPP shall be modified whenever there is a change in the design, construction, <br /> operation, or maintenance at the construction site that has, or could have, a significant <br /> effect on the discharge of pollutants to waters of the state. <br /> - The SWPPP shall be modified if, during inspections or investigations conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that <br /> the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to include additional or <br /> modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be <br /> completed within seven (7) days following the inspection. <br /> Element 13: Protect Low Impact Development BMPs <br /> The proposed permeable pavement facility shall be protected to the maximum extent feasible from <br /> sedimentation and compaction during construction. <br /> • Do not allow muddy construction equipment on the base material or pavement. <br /> • Do not allow sediment-laden runoff onto permeable pavements or base materials. <br /> • Perform excavation with machinery operating adjacent to the facility and do not allow <br /> heavy equipment with narrow tracks on the bottom of the BMP. <br /> 250 4th Avenue South,Suite 200 <br /> Edmonds,WA 98020 <br /> ENGINEERING ph.425.778.8500 I f.425.778.5536 <br /> www.cgengineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.