My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
112 SE EVERETT MALL WAY LOVERS PACKAGE 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
112
>
LOVERS PACKAGE
>
112 SE EVERETT MALL WAY LOVERS PACKAGE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2019 3:50:25 PM
Creation date
3/8/2019 3:46:08 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
112
Tenant Name
LOVERS PACKAGE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> , <br /> INFORMATION FOR DEVELOPER: <br /> The following information is provided for the developer's benefit. These are not SEPA conditions but are <br /> associated with other laws or requirements. All requirements ue preliminary in nature, and aze based <br /> upon the preliminazy site plan and the ordinances in effect at time of submittal for SEPA review. The <br /> proposal must comply with all ordinances in effect at the time a complete building permit application <br /> is filed, including those not specifically set forth herein. (F.xception: For vesting under the Zoning <br /> Code, please refer to Section 44 of the Zoning Code). Contact the Planning Department for information <br /> regazding appeals processes for the requirements listed in this document. <br /> 1. Detailed drawings in accordance with City Design and Construction Standards shall be submitted to the <br /> Public Works Depanment, showing site pazking layout, landscaping, utilities, storm drainage, <br /> temporary construction erosion conuol, and all required unprovements in the public right-of-way. <br /> Public Works Depaztment approval of these drawings is required prior to any permits being issued. <br /> All improvemenu shall be completed and approved warranted before the Occupancy Permit is <br /> issued/final approval is granted. <br /> 2. Pazking must be per City Zoning Code and City Design and Construction Standards. Provide a <br /> minimum of 19 off-street pazking spaces. <br /> 3. Lack of comment on the plans submitted with the application does not constitute approval of these <br /> • plans. <br /> 4. A fire hydrant is required within 200 driving feet but not closer than 50 feet of every structure. <br /> 5. Ciry streets and alleys are to be kept c?ear of dirt and debris at all times during construction. Dust <br /> suppression and street cleaning must occur as d'uected by the Public Works Inspector. <br /> 6. A Performance Guarantee is required for street improvements prior to any building permit being <br /> issued. <br /> 7. As-builts of storm sewer, sanitary sewer, and water systems will be required to be submitted per City <br /> Design and Construction Standards and Specifications. <br /> 8. Any broken or damaged sidewalk shall be repaired/replaced per the Ciry Public Works Iaspector. <br /> Pedestrian connections to public sidewalks are required. <br /> 9. Project must comply with the State Building Code and City of Everett sprinkler otdinance. A building <br /> permit is required. <br /> 10.If 5,000 square feet or more of pavement will be created and or redeveloped, treatment of storm water <br /> runoff in accordance with Ciry standazds will be required. <br /> 11. Placement and screening of refuse disposal areas must be provided per Section 39.080 of the Zoning <br /> Code as follows: Jazbage receptacles, dumpsters, and recycle bins shall be provided in all multiple <br /> family, commercial, industrial, and institutional developments and shall not be located in a required <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.