I� ,� �,.. � C� T:� � .- c.; E
<br /> � 14 �9 � �„ry�. �'� ''��, '-`�� �c "". N � �
<br /> " "' �;'�, LEGEND: �1� � 00 �
<br /> SITE BOUNDARY � W � �¢ � v>
<br /> `�f��` �+�� UTILITIES-AS SPECIFIED ,�,,, U � N �� ro
<br /> Ce `�� p SD - - - - STORM WATER � � � �; "
<br /> `i�� � POWER rn w'
<br /> �•�� i _ - -- - WATER (� � �,
<br /> ����� CO GAS �_..
<br /> �• --
<br /> � ��� � BUILDING DEMOUTION � U �
<br /> � ��
<br /> � � '�,,,o -� TEMPORARY FENCE V (� �,:� �
<br /> � I � �;
<br /> "�� �� / i �'��` �� ASPHALT CONTAINMENT BERM O >... � � �
<br /> P �v � `�� -` SO � � QN �
<br /> . � , �O � `4�` � '�"'J O � � ^ �
<br /> Q/ �� NOTE; LOCATION AND DISTANCES SHOWN ARE � cc-� a'
<br /> I �
<br /> ' � ��` APPROXIMATE � V o o N ;�
<br /> � �
<br /> � �� ����` ^ � C � �
<br /> / � `'��� � Q� .e �
<br /> ��' /
<br /> I O / �
<br /> � �� � ♦� !
<br /> � ' � '' '
<br /> �.. `� !� 'I� � / o
<br /> d p
<br /> � �` t ' � r c � O
<br /> 1
<br /> � Q I�
<br /> ' `� - � -'� % � ERVICE INTAK� ; _ � � �
<br /> � <� �� � , SPECIFICATION3: ,= � � o
<br /> \ � c� � �
<br /> ` ,� , / � GENERAL ,- �C N Q'
<br /> � �` � � 1. SITE SOIL AND GROUNDWATER IS IMPACTED WITH GASOLINE,DIESEL,AND OIL RANGE O1 � � '�
<br /> �' PETROLEUM HYDROCARBONS.
<br /> / � � /
<br /> � 2. OWNER WILL OBTAIN THE GRADING AND BUILDING DEMOLITION PERMITS.
<br /> � �^ 3. CONTRACTOR WILL OBTAIN WASTE PROFILE AND MANIFESTS.
<br /> �� / �y vC � 4. THE CONTRACTOR WILL CONTACT 811 UTILITY LOCATE SERVICE AND CONDUCT A PRIVATE
<br /> '� I UTILITY LOCATE PRIOR TO THE START OF SUBSURFACE WORK.THE CONTRACTOR SHALL INFORM a.'�-�-�
<br /> -�
<br /> / THE ENGINEER OF ANY NEW FINDINGS, �,' L �; ��
<br /> / �� 5. PROTECT BUILDINGS NEXT TO EXCAVATION AREA. ,���-� � 1� �1, ''�
<br /> /► � t�, /�;:, ,,
<br /> / �,�� f 1��` � � 6. CONTRACTOR MAY USE AREA WEST OF EXCAVATION AREA FOR STOCKPILING AND STAGING.NO ,<,� � '' � �, `�
<br /> ��� � � � ��� e+�� � � WORK WILL BE CONDUCTED IN THE PUBLIC RIGHT OF WAY. ,� ii �� ��,
<br /> � � ,
<br /> °,�� / � ���`s O / 7. E X I S T I N G R O A D W A Y S A N D T E N A N T A C C E S S C A N N O T B E B L O C K E D D U R I N G C O N S T R U C T I O N. �. �
<br /> �__" 1 � /
<br /> ��� �,� � � 8. CONTRACTOR SHALL COORDINATE WITH THE OWNER/ENGINEER TO SCHEDULE CONSTRUCTION ��, ;�
<br /> / �p��' ��► � ACTIVITIES WITHIN EXCAVATION AREA"B"TO MINIMIZE DISRUPTIONS TO THE TENANT ON THE c� ` � � �' k�
<br /> [J � � `���, I PROPERTY. v�,_: _. ' ,.ti:���+
<br /> �
<br /> , j � � ` � ��.'� �,�,_�:'�"`.�_
<br /> � `�` dY � ��'fr.
<br /> p '''� I�
<br /> ` F
<br /> y r1��` ���� SCOPE OF WORK
<br /> ��O ��� O PROVIDE ALL LABOR, EQUIPMENT,AND MATERIAL TO COMPLETE THE WORK.COMPLY WITH ALL
<br /> f, � �� APPLICABLE FEDERAL,STATE,AND LOCAL RULES,REGULATIONS,AND ORDINANCES.THE WORK
<br /> ` �� /� �., ` ��` INCLUDES,BUT IS NOT LIMITED TO:
<br /> "� �°�� l..� \` ��` 1. PROVIDE AND MAINTAIN TEMPORARY FACILITIES FOR THE CONTRACTOR'S NEEDS.
<br /> r` ` -, �� 2. INSTALL AND MAINTAIN TEMPORARY EROSION CONTROL MEASURES.THE DESIGN IS BASED ON
<br /> �
<br /> ' �-•�,,,. �� TOTAL CONTAINMENT. NO SURFACE DISCHARGES ARE ALLOWED.CONTRACTOR SHALL MEET
<br /> ��' '� .,,, ��� REQUIREMENTS OF CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(CSWPPP)AT
<br /> �� ALL TIMES THROUGHOUT DURATION OF PROJECT.
<br /> � � ' ' '` � ��� 3. PERFORM ASBESTOS,LEAD,AND UNIVERSAL WASTE ABATEMENT PRIOR TO BUILDING
<br /> � �"'��q` ��` O DEMOLITION.LOCATIONS OF MATERIALS REQUIRING ABATEMENT ARE SPECIFIED IN THE PROVIDED
<br /> � � �� �, DEMOLITION-LEVEL REGULATED BUILDING MATERIAL INSPECTION REPORT. Z
<br /> �-�.` s�I 4. DEMOLISH THE SOUTHERN HALF OF THE COMMERCIAL SALES/SERVICE INTAKE BUILDING. �
<br /> � � `� � ��` s - PROPERLY ABANDON PIPING IN THE AREA FOR DEMOLITION.
<br /> �� �� 5. INSTALL PIPE PILING SUPPORT TO ALLOW FOR VERTICAL EXCAVATION ALONG BUILDINGS.PIPE �
<br /> � " �` PILINGS TO BE INSTALLED PER STRUCTURAL PLANS BY CG ENGINEERING. �
<br /> � �'` 6. REMOVE EXISTING ASPHALT AND OTHER FEATURES AS NEEDED TO COMPLETE THE WORK.
<br /> ''� 7. EXCAVATE THE IMPACTED SOIL TO THE PROJECT DESIGN EXTENT.EXTENT OF EXCAVATIONS
<br /> �`�''� � MAY BE ADJUSTED DEPENDENT ON FIELD CONDITIONS.CLEAN OVERBURDEN SOIL TO BE
<br /> ^� / STOCKPILED ON SITE FOR USE AS BACKFILL.MANAGE STOCKPILES AS NEEDED.
<br /> � � �� 8. LOAD OUT AND PROVIDE TRANSPORTATtON FOR ALL EXCAVATED CONTAMINATED MATERIAL. J
<br /> �' Q���� NON-HAZARDOUS WASTE SHALL BE TRANSFERRED TO A PERMITTED WASTE HANDLING FACILITY.
<br /> � � �/I I y THE FACILITY SHALL BE PROVIDED TO THE ENGINEER PRIOR TO THE START OF WORK FOR
<br /> '`� � �� � � :` APPROVAL. �
<br /> a, O� � � 9. BACKFILL EXCAVATED AREAS TO THE DESIGN GRADES. � Z
<br /> 1 �� Q� / � 10.PAVE THE DISTURBED AREA OF THE SITE WITH ASPHALT AND RESTORE ANY OTHER � O
<br /> ,.. / / : FEATURES AFFECTED BY THE WORK. r n �
<br /> .,. / / v �n
<br /> � -. ,� � � O V
<br /> � 0 ��� HEALTH AND SAFETY � �
<br /> r��` Sn � 1. PREPARE AND SUBMIT A SITE-SPECIFIC HEALTH AND SAFETY PLAN(HASP)THAT IS AT LEAST AS � -
<br /> �� �� v STRINGENT AS THE ENGINEER'S HASP. � Z =
<br /> �� / '^
<br /> �� 2. ALL PERSONNEL WORKING ON THE SITE MUST HAVE 40-HOUR HAZWOP TRAINING,MEDICAL � W �„
<br /> ��� MONITORING,AND IF APPLICABLE A RESPIRATOR FIT TEST.INCLUDE ALL APPLICABLE CERTIFICATES � ,�' �
<br /> �� FOR ALL PERSONNEL, INCLUDING THE SUBCONTRACTORS,WITH A HASP. � �
<br /> ��� ��� 3. CONDUCT ANY PERSONAL AIR SAMPLING AND MONITORING AS APPLICABLE. � m �
<br /> C8 ���� SO / , 4. ASSIGN A SITE SAFEN OFFICER FOR THE PROJECT THAT HAS THE AUTHORIN TO SHUT THE �
<br /> °"r,`` � PROJECT DOWN.SAFETY OFFICER MAY HAVE OTHER DUTIES ON SITE,SO LONG AS IT DOES NOT �
<br /> �.� . TAKE AWAY FROM HIS/HER PRIMARY ROLE AS THE SAFETY OFFICER. W
<br /> � � � W
<br /> ��� 5. PROVIDE SAFEN DATA SHEETS FOR ALL MATERIAL AND PRODUCTS BROUGHT ON SITE WITH THE �
<br /> ��� HASP. � �
<br /> � " .� / SUBMITTALS � O W
<br /> `^� / PRECONSTRUCTION SUBMITTALS w � �
<br /> � ` "" 1. WORK PLAN:DISCUSS THE PROJECT APPROACH,SEQUENCING,METHODOLOGY,AND � w
<br /> +r � TEMPORARY EXCAVATION,PROVIDE SCHEDULE,SUBCONTRACTORS,EQUIPMENT TO BE USED,AND
<br /> ? ~' � � OTHER RELEVANT INFORMATION TO COMPLETE THE WORK. -
<br /> 2. SITE-SPECIFIC HEALTH AND SAFETY PLAN,DISCUSS THE PROJECT-SPECIFIC CONTROL ZONES, V�
<br /> � ! ''+ � PROCEDURES,MONITORING,EMERGENCY RESPONSE,ROUTE TO THE HOSPITAL, ETC. HASP MUST
<br /> � ��I� I'��i ,�'� �� �' ` 'r � �' � � BE AT LEAST AS STRINGENT AT THE ENGINEER'S HASP. �
<br /> R , i � Q�_� , _;
<br /> H � �`� � "� ` ��� '� � �`"` � " 3. SPILL PREVENTION,CONTROL,AND COUNTERMEASURE PLAN:DISCUSS THE PROPOSED Q
<br /> O � PRACTICES FOR SPILL MANAGEMENT,RESPONSE TO SPILLS, PROVIDE A DRAWING WITH THE �
<br /> �' � LOCATION OF SPILL KIT(S),ETC. (�
<br /> � � 4. SOURCES OF BARROW MATERIAL AND THE CHEMICAL ANALYSIS FOR THE MATERIAL.BARROW r
<br /> � "� / MATERIAL MUST NOT EXCEED APPLICABLE MODEL TOXICS CONTROL ACT METHOD A CLEANUP �
<br /> � � _ � L E V E L S F O R P E T R O L E U M H Y D R O C A R B O N S A N D R C R A 8 M E T A L S, �
<br /> � ! 5. RELEVANT CERTIFICATION FOR ALL SITE WORKERS,E.G.40-HOUR HAZWOP,RESPIRATOR FIT
<br /> � ` TEST,ETC. �
<br /> � " �� CONSTRUCTION SUBMITTALS
<br /> � 6. CHAIN OF CUSTODY AND LABORATORY RESULTS FOR ANY SAMPLES COLLECTED.THESE
<br /> ` INCLUDE,BUT ARE NOT LIMITED TO,PERSONAL MONITORING SAMPLES,BACKFILL GRADATION,AND
<br /> K PROCTOR TESTS,ETC.
<br /> � 7. VENDOR SPECIFICATIONS SHEETS AND SHOP DRAWINGS FOR MATERIALS AND PRODUCTS.
<br /> = POST-CONSTRUCTION SUBMITTALS
<br /> � 8. ANY DOCUMENTATION ON THE PROJECT THAT WAS NOT SUBMITTED PREVIOUSLY.E.G.,
<br /> LNL � DISPOSAL TICKETS.
<br /> d' DRAWN BY:
<br /> � UTILITIE8 E I N
<br /> O 1. UTILITIES SHOWN ON DRAWING ARE APPROXIMATE FROM PREVIOUS LOCATING EFFORTS. CHECKED BY: TWL
<br /> �
<br /> �
<br /> � 2. POWER,GAS,AND WATER LINES ON WEST SIDE OF EXCAVATION WILL BE MOVED PRIOR THE
<br /> `p O 1 O 20 START OF WORK AND SHALL NOT BE INCLUDED UNDER THIS SCOPE OF WORK.UTILITIES TO BE DATE
<br /> LL
<br /> MOVED BY OWNER'S CONTRACTOR. 1 1/1 7
<br /> C
<br /> m FEET
<br /> PROJECT N0.
<br /> �
<br /> 160594V003
<br /> � F I G U R E
<br /> 0
<br /> `° G-1
<br /> �