Laserfiche WebLink
Draft 7/27/2018 2 <br /> Contents <br /> Executive Summary 3 <br /> Goal 5 <br /> Objectives 5 <br /> Permanent Boeing Direct Count System 5 <br /> Definition of Terms 5 <br /> Roadway System Peak Period 6 <br /> Purchase, Installation, Operation and Maintenance of Count Equipment 6 <br /> Baseline for Assessing Mitigation 7 <br /> Confirming the Initial Baseline 8 <br /> Conclusion on Baseline 12 <br /> 1996 Planned Action Traffic Volumes and Capacities Review 13 <br /> Attachment 1: Preliminary Evidence from Boeing 16 <br /> Attachment 2: The Boeing Peak and the System Peak 17 <br /> Attachment 3: Methodology for Determining the Current Boeing PM Peak Hour and PM <br /> Peak Hour Volume 18 <br /> c users campkdocuntents-Opened trom outlook attachment c(JnethodologV)doc <br />