Laserfiche WebLink
Draft 7/27/2018 15 <br /> Allocation to the Subarea of between 10,000 and 15,000 additional employees would <br /> require the construction of transportation improvements to increase the capacity at the <br /> screenlines. The construction of additional capacity on SR 526 would probably provide <br /> the best accommodation for significant employment increases (up to 15,000) in the SW <br /> Everett/Paine Field Subarea. <br /> c users,camps;documents?opened_from_outlook\attachment c(methodoloe})doc <br />