My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2416 COLBY AVE 2019-03-14
>
Address Records
>
COLBY AVE
>
2416
>
2416 COLBY AVE 2019-03-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2019 9:57:52 AM
Creation date
3/14/2019 9:57:50 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2416
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: Bruce Braga<bruce awaelec.corr> <br /> Sent:Wednesday,July 11,2018 10:36 AM <br /> To: Michael Bearda<MBearda everettwa. ov> <br /> Cc:Peeler,Joanna J.'<jpeelerPeveretd.or > <br /> Subject: Dishwasher Replacement at Everett HS <br /> HI Mike, <br /> I'. <br /> Just checking in on this,. <br /> Can Everett Public Schools proceed with the dishwasher replacement? <br /> I assume the contractor needs to pull an over the counter permit unless you would like more information before then? <br /> Please advise, <br /> Thanks, <br /> Bruce Braga P.E. ,Senior Engineer <br /> AA <br /> AWA Electrical Consultants,Inc. <br /> Ph.#(425)775-1799 <br /> www.awaelec.com <br /> I , <br /> From: Bruce Braga [ma)Ito:bruceCcawaelec.com] <br /> Sent: Monday, July 09, 2018 2:08 PM <br /> To: 'Mike Bearda (mberda c@everettw:a.gov)' <br /> Subject: Dishwasher Replacement at Everett HS <br /> HI Mike, <br /> We are the electrical engineers for Everett Public Schools for the dishwasher replacement at Everett High School This <br /> Summer. <br /> The electrical work on this is fairly basic; <br /> 1. Remove a 40 amp,240V 3 phase dishwasher booster heater circuit and remove a 20 amp 240V 3 <br /> phase dishwasher circuit from the kitchen panelboard. <br /> 2. Provide a new 70 amp,240V 3 phase dishwasher circuit for the new dishwasher from the same existing kitchen <br /> panelboard. (single point of connection) <br /> The existing 225 amp kitchen panelboard was metered under working conditions(standard school days)with peak <br /> demand at 66 amps.. <br /> I have attached the plans for your review, but if you would like a hardcopy of the plans,we can drop that by your office <br /> also. <br /> Please advise, ll <br /> ' I <br />
The URL can be used to link to this page
Your browser does not support the video tag.