Laserfiche WebLink
Lighting Summary LTG-SUM <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2,R3,R4 over 3 stories and all R1 Revised Nov 2017 <br /> Project Info Project Title: The Everett Clinic-Dermatology Clinic Remodel Date 9/13/2018 <br /> Compliance Applicant Information. Provide contact information for individual who can For Building Department Use <br /> forms do not respond to inquiries about compliance form information provided. <br /> require a Company Name: The Everett Clinic <br /> password to <br /> use. Company Address: 3901 Hoyt Ave. <br /> Instructional and <br /> calculating cells Applicant Name: Janet Monda <br /> are write- <br /> protected. Applicant Phone: 425-823-2244 <br /> Applicant Email: janet©awerks.com <br /> Project Description ❑New Building ❑Addition 0 Alteration ❑No Lighting Scope <br /> Include PROJ-SUM form(included in envelope forms workbook)with lighting compliance forms. <br /> Interior Lighting System Relocation of existing exit light.New lighting in 2 newly configured rooms. <br /> Description <br /> Q Interior Lighting Plans Included <br /> Interior Lighting Power 0 Building Area Method Q Space-by-space Method <br /> Allowance Method Select method used in project. <br /> Interior Lighting Controls ❑✓ All C405.2.1-C405.2.8 Lighting Controls ❑C405.2 Exception 5 Luminaire Level <br /> Lighting Controls(LLLC) <br /> ❑Additional Efficiency Package Option <br /> C406.4 Enhanced Digital Lighting Controls <br /> To comply with C406.4,no less than 90%of the total installed interior lighting power shall comply with the <br /> required controls per C406.4. <br /> Dwelling Unit Interior Permanently installed interior lighting fixtures in dwelling units comply with: C) No Dwelling <br /> Lighting 0 C405.2 thru C405.5 Commercial Lighting Controls and LPA Units <br /> 00406.3 High Efficacy Lighting <br /> 0 R404.1 Residential High Efficacy Lighting. Dwelling unit lighting complies with WSEC Residential <br /> provisions in lieu of WSEC Commercial provisions. <br /> Exterior Lighting System No work. <br /> Description <br /> ❑ Exterior Lighting Plans Included <br /> Building Additions Compliance Method Interior lighting Exterior lighting <br /> Lighting systems in addition area comply with all applicable ❑ ❑ <br /> provisions as a stand alone new construction project <br /> Refer to Section C502.2.6 for additional <br /> requirements. Lighting systems in addition are combined with existing ❑ ❑ <br /> building lighting systems to demonstrate compliance <br /> Addition is combined with existing: <br /> For interior lighting projects,include new+existing-to-remain interior lighting fixture wattage in <br /> Proposed Lighting Wattage table in LTG-INT-BLD or LTG-INT-SPACE form. <br /> For exterior lighting projects,include new+existing-to-remain exterior lighting fixture wattage in <br /> Proposed Tradable and Proposed Non-Tradable Lighting Wattage tables in LTG-EXT form. <br />