Laserfiche WebLink
• <br /> Cl coo 7- oz� <br /> 4323 2c+ 1 Sc„ <br /> to /07 <br /> Project Name: Everett River Front-Simpson Report: 108 <br /> GeoDesign#: Polygon-127-01 Date: 8/26/2016 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> DFR 052 PW1505-005 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather:Clear, 80's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1245/1330 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg, E.I.T. <br /> Attachments: m Site Plan(s) m Density Test Summary Signature: <br /> ❑ Installation Records 0 Other Reviewed By: N <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg, was on-site at the request of Eddy Stevens with Polygon to <br /> observe foundation subgrade for Lot 109. <br /> SUMMARY of OBSERVATIONS: <br /> Lot 109: <br /> Upon arrival, GeoDesign noted that foundation excavation subcontractor had finished digging the footing and crawl space <br /> using a Case CX130 excavator and grade blade. GeoDesign noted that the exposed foundation subgrade generally <br /> consisted of a brown silty SAND (f-m)with gravel (f-c)which could be penetrated less than 2 inches using a 1/2 inch <br /> diameter soil probe under the full weight of the user; in-place density tests taken on the north, east, and south side indicated <br /> that the material had been compacted to greater than 95%of its maximum dry density as determined by a Modified Proctor <br /> analysis. <br /> It is the opinion of GeoDesign that the exposed foundation subgrade is currently suitable for support of the intended load. <br /> GeoDesign recommends that any surficially loose and/or saturated material be removed from the base of the footings prior <br /> to the placement of concrete. <br /> A summary of our observations and density tests taken today can be found in the attached Nuclear Density Gauge Data <br /> and Figure 1. <br /> GeoDesign notified the client and contractor of our observations prior to our departure from the site today. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents.Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 210 I Seattle,WA 98133 I 206.838.9900 ^, <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />