Laserfiche WebLink
EO DESIGNZ NUCLEAR DENSITY GAUGE DATA - <br /> GDI Project: Pptygon-1'27.01 Project Name: Everett Rive rfront.-Simpson Date: -: -.. 9/6/2017 <br /> Sampled By: BGW Project Locations Everett WA Pager <br /> Material Source Dens ity:pcf(required) Optimum.Moisture <br /> A Polygon-127-01_20160511_51 A 1 3 5.2 ASTM D1557C A 7.0 <br /> B Polygon-127-01_20160527_52 B 1 30.9 ASTM D1557C B 8.7 <br /> C Polygon-127-02_20160421_S2 C 136.5. ASTM D1557C C. 6.7 <br /> Dy D D <br /> *BG = below grade <br /> Test **Blows% - .: . Dry;Dens`ity <br /> Date Location Elevation* Fill Type Compactor <br /> (pcf) Moisture Maximum Required <br /> 1 9/6 SEWER MAIN-D/W"6 STA 1+85 24* - -3 C Roller 131.7 8.1 96 5Yo 95 <br /> 2:.. 9X6 . SEWER MAIN-_D/W"13"-STA 1+65 ,20*/10" •1 C Roller 132.8 9.6 97.3% 95 <br /> 3 9/6 LOT 118 WEST SIDE CENTER 20*/6" 0 C Roller? 134.3 8.0 98.4% 95 <br /> 4 9/6 .LOT 118-SOUTH SIDE CENTER 20*/8" 0 C Roller? 139.8 7.3 100+% 95. <br /> ' , ,5 9/6 LOT 118 EAST SIDE CENTER 20*/6"__.. 0 C _: Roller? 140.6 7.3 100+% 95 <br /> 6 9/6 LOT 117-SOUTH SIDE-CENTER 22* 0 C Roller? 136.5 9.4 100.0% 95 <br /> 7 9/6., LOT 117-EAST SIDE-CENTER 20*/6" 0 C Roller? 134.4 8.3 98.5% <br /> 95 <br /> 8,,. 9/6 LOT 117-NORTH SIDE-CENTER 20*/8 0 C Roller? 139.7 7.3 100+% 95 <br /> 9* 9/6 LOT 117 WEST SIDE-CENTER 18*/8" 0 C Roller? 135.1 11.6 99.0% 95 <br /> Polygon-127-01_20160906_Density -/K <br />