Laserfiche WebLink
INSPECTION REPORT l $ `f '03 <br /> Date L2.- t Permit: e...0 126S -0Y5 <br /> Contractor: • ,.t --AP's. <br /> 1111, <br /> Owner: r r,_ r <br /> t <br /> Site Address: U[O3 29U- ` C( JV <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service l♦F :ming ❑Rooftop Units ❑Water Service <br /> ❑Grounding P` Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid •Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHR OR CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> /❑ FOR T.C.O. ❑ CORRECTION REQUESTED 1=1❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Cni ik.... / <br /> t / ''*-PL <br /> i <br /> 1' <br /> . •-4-674....„ <br /> r t <br /> `" <br /> Inspector: Date: �t� <br /> EIR(10/06) DATABAR,INC. <br />