Laserfiche WebLink
EO DESIG NZ NUCLEAR DENSITY GAUGE DATA ' <br /> GDI Project: Polygon-127-01 _ Project Name: Everett Riverfront Simpson Date: 9/6/2017 <br /> Sampled By: BGW Project Location: Everett WA Page: _ o <br /> Material Source, Dens'ity:pcf(required), Optimum',Moisture <br /> A Polygon-127-01_201605,11_51 A 1 35.2 ASTM D1557C A 7.0 <br /> B Polygon 12701_20160527_52 B 1 30.9 ASTM D1557C B 8.7 <br /> C Polygon-127-02_20160421_52 C 1 36.5, .. ASTM D1557C C 6.7 <br /> D D D <br /> *BG = below%rade: <br /> Test **Blows/m Dry Densityl % %. <br /> Date Location 1;2-in Elevation* Fill Type Compactor <br /> (pcf) Moisture Maximum Required <br /> 1 9/6 SEWER MAIN-D/W"B"-:STA 1+85 24* -3 Cy Roller 131.7 8.1 1 96,5% 95 <br /> 2_ 9/6 SEWER MAIN-DIW"R"-STA 1+65 . 20*/10" -1 C Roller 132.8 9.6 97.3%% 95 <br /> 3 9/6 LOT 118 WEST SIDE-CENTER 20*/6" 0 C Roller? 134.3 8.0 98 4% 95 <br /> 4 9/6 LOT 118-SOUTH SIDE CENTER 20*/8" 0 C Roller? 139.8 i 7.3 100+% 95 <br /> 5 9/6 LOT 118-';EAST SIDE-CENTER 20*/6" :.. 0 C Roller? _ 140.6 7.3 100+% 95 <br /> 6 9/6 LOT 117-SOUTH SIDE-CENTER 22* 0 C Roller? 136.5 9.4 100.0% 95 <br /> 7 9/6 LOT 117-EAST SIDE-CENTER 20*/6" 0 C Roller? 134.4 8.3 y 98.5% ' 95 <br /> ..... <br /> 8 9/6 LOT 117 NORTH SIDE-CENTER 20*/8" . 0 C :Roller? 139.7 7.3 100+% 95 <br /> 9* 9/6 1 LOT 117-WEST SIDE-CENTER 18*/8" 0 C Roller'? 135.1 11.6 99.0% 95 <br /> ir <br /> 4 <br /> a � <br /> Polygon-127-01_20160906_Density - '' <br />