FIELD REPORT DER 035
<br /> z PHOTO LOG Date: 5/03017
<br /> 44of 5
<br /> CEO _
<br /> :,j sem'
<br /> . 77,,,,t-;:,..47,L,-..,..1.-..
<br /> k ' Iii'',
<br /> ;',,,,,,,-7".•4.7-4 " i .o11 �a a .a• , * .w
<br /> ,t
<br /> _ iv,=, .7to.,,,,,,,, 7 '-‘.
<br /> bel, 5 `ttm �
<br /> • a , 'fir ^` a , �5
<br /> :-
<br /> .7,4,-7,-.7.: :.,-,,,,,
<br /> s m .t ‘1,1,..,::,,,.•' t$'a�k �° . ': '+ ' .ate `-
<br /> sa s
<br /> Comments: Lot 225-Over-excavated area-1.5 feet to 3.0 Comments: Lot 224-Over-excavated area in southeast
<br /> feet below bottom of footing corner lot area(-3 4 feet of over excavation)
<br /> . ' der ,
<br /> „5;,I.
<br /> � t
<br /> ,
<br /> lk;'''.47i:',';`,4**-11:', ";',11,:k•<7,;:t•-:•'' • ''.' '
<br /> ;. ," ;� s5 'I C
<br /> , ': 1 Y _'—v=4,"4.0"..0‘. $:M* to xw "^t
<br /> .
<br /> . iy ,' --- t .•tea •
<br /> Comments: Lot 224-Over-excavated area(-5 feet in Comments: Lot 226- lot area covered/backfilled with
<br /> depth)in southeast corner which could be probed 3 feet railroad ballast material.
<br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the
<br /> contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does
<br /> not include supervision or direction of the contractor,the contractors employees or agents. Our firm is not responsible for site safety. This field report is a
<br /> DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered final upon review of the
<br /> GeoDesign project manager,as indicated by initials in the"Reviewed By"section.
<br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900
<br /> , /"...''')
<br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 !d
<br />
|