15 E <br /> EO DESICN FIELD REP*4' <br /> 0" 2 <br /> Project Name: Everett River Front-Simpson Report: 043 <br /> GeoDesign#: Polygon-127-03 __- Date: 05/18/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather:Cloudy, 50's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1000/1030 <br /> Distribution: -- <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg <br /> Attachments: -m Site Plan(s) 0 Density Test Summary Signature: .0i *Z <br /> Li Installation Records rrroiVer Reviewed By; <br /> .� ,.,w.,... <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg,was on-site part time at the request of Craig with DDS to <br /> observe the foundation area for Lot 234. <br /> SUMMARY of OBSERVATIONS: <br /> Lot 234: <br /> Previously, GeoDesign noted that DDS over-excavated unsuitable areas for Lot 234. Today, GeoDesign noted that DDS <br /> had backfilled the over-excavated area with a 2-inch clean crushed material tamped into a firm and unyielding mass using <br /> the bucket of an excavator. It is the opinion of GeoDesign that the exposed foundation area for Lot 234 observed today is <br /> currently suitable for support of the intended structure. GeoDesign recommends that any surficially loose and saturated <br /> material be removed from the base of the footing area prior to the placement of concrete. <br /> The client and contractor were notified of our observations prior to our departure from the site. <br /> A summary of our observations can be found in the attached Figure 1. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents.Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as Indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />