My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4512 RIVERFRONT BLVD 2019-03-14
>
Address Records
>
RIVERFRONT BLVD
>
4512
>
4512 RIVERFRONT BLVD 2019-03-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2019 4:35:15 PM
Creation date
3/14/2019 4:35:10 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
4512
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I, <br /> GEoDEsIGNFIELD REPORT <br /> Project Name: Everett River Front-Simpson Report: 093 <br /> GeoDesign#: Polygon-127-03 Date: 2/2/2018 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> F <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Cloudy, 40's <br /> Ron Bowen(Polygon) j Eddy Stevens(Polygon) Arrival/Departure: 0830/1100 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg, EIT <br /> m Site Plan(s) m Density Test Summary Signature: 5,, ...-�✓ <br /> Attachments: ❑ Installation Records 0 Other <br /> Reviewed By: <br /> SUMMARY OF OBSERVATIONS(CONTINUED): <br /> Lot 215:\ <br /> Previously, GeoDesign identified three areas along the east,west, and south edge of the foundation area with unsuitable <br /> material which required over-excavation of 6 inches to 5 feet of material. Today, GeoDesign noted that the foundation <br /> excavation subcontractor had completed backfilling the over-excavated areas with a 2-inch clean crushed rock material <br /> compacted into a firm and unyielding mass. <br /> Relative compaction of the remaining exposed foundation subgrade soil was tested using a Troxler Moisture-Density gauge; <br /> an in-place density test confirmed that the material had been compacted to greater than 95%of its maximum dry density as <br /> determined by a Modified Proctor analysis. <br /> It is the opinion of GeoDesign that exposed foundation subgrade observed today is currently suitable for support of the:. <br /> intended structure.'-GeoDesign recommends that any surficially loose and saturated material be removed from the base of <br /> foundation areas prior to the placement of concrete. <br /> Lot 216: <br /> Today, GeoDesign noted that DDS had completed excavation of the footing and crawl space area for Lot 216. The exposed <br /> footing subgrade soil generally consisted of a gray-brown silty AND with gravel that could probed less than 2 inches using <br /> a 1/2 inch diameter soil probe. Relative compaction of the footing subgrade soils was tested using a Troxler <br /> Moisture-Density gauge; in-place density tests indicated that material had been compacted to greater than 95%of its <br /> maximum dry density as determined by a Modified Proctor analysis. <br /> It is the opinion of GeoDesign that exposed foundation subgrade observed today is currently suitable for support of the <br /> intended structure. GeoDesign recommends that any surficially loose and saturated material be removed from the base of <br /> foundation areas prior to the placement of concrete. - <br /> A summary of observations and density tests taken can be found in the attached Figure 1 and Nuclear Density Gauge Data. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By'section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 ��,,, <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 7/ <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.