liDESIGN?_u FIELD REPORT <br /> tea. <br /> Project Name: Everett River Front-Simpson Report: 117 <br /> GeoDesign#: ; Polygon-127-01 Date: 9/19/2016 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> '/�/�T////////�,//l///,d//i�//Jf.'/////%//G//Ji/lll�////,///,%//////�//(//%%%//%//////////i/////%%//Gf/%!l///%//%///,i/;;x,%///G%/%//1/ao/%!�/!!��� / �� - ���i/�/:/ % vi✓/io-:i� i i ;> <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather. Cloudy, 60's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1815/1845 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg, E.I.T. <br /> Attachments: m Site Plan(s) © Density Test Summary Signature: _ <br /> 0 Installation Records 0 Other Reviewed By: <br /> PURPOSE of VISIT: GeoDesign representative, Benjamin Weinberg,was on-site at the request of John Feltner with <br /> Polygon to observe foundation subgrade for Lots 129 and 128. <br /> SUMMARY of OBSERVATIONS: <br /> Lot 129: <br /> Upon arrival at approximately 8:00 AM, GeoDesign noted that the foundation excavation subcontractor had finished digging <br /> the footing and crawl space area for Lot 129 and that the excavation was currently filled with approximately 3-4 inches of <br /> water. GeoDesign notified John with Polygon that the foundation area would need to be dewatered prior to evaluation of <br /> the foundation subgrade. GeoDesign departed the site at approximately 8:15 AM and returned at 6:15 PM. After returning, <br /> GeoDesign noted that the foundation excavation area had been dewatered,with scattered puddles with less than 2 inches <br /> of water. The exposed foundation subgrade consisted of a gray silty SAND (f-m)with gravel (f-c)which was evaluated <br /> using a 1/2 inch diameter soil probe and a Troxler Moisture-Density gauge. Penetration depths encountered were generally <br /> less than 2 inches and in-place density tests indicated that the exposed foundation subgrade had been compacted to <br /> greater than 95%of its maximum dry density as determined by a Modified Proctor analysis. <br /> It is the opinion of GeoDesign that the exposed foundation subgrade is suitable for support of the intended structure and <br /> recommends that any surficially loose and saturated material be removed from the base of the foundation prior to the <br /> placement of concrete. A summary of our observations and density tests taken today can be found in the attached Nuclear <br /> Density Gauge Data and Figure 1. <br /> Lot 128: <br /> Upon return to the site, GeoDesign noted that the foundation excavation subcontractor had excavated approximately 80% <br /> of the foundation and crawl space area for Lot 128. GeoDesign noted that the exposed foundation subgrade generally <br /> consisted of a gray silty SAND(f-m)with gravel (f-c)which could be penetrated less than 2 inches using a 1/2 inch diameter <br /> soil probe; in-place density tests taken on the west,south, and east side indicated that the material had been compacted to <br /> greater than 95%of its maximum dry density as determined by a Modified Proctor analysis. <br /> It is the opinion of GeoDesign that the exposed foundation subgrade observed today is currently suitable for support of the <br /> intended structure. GeoDesign recommends that any surficially loose and saturated material be removed from the base of <br /> the foundation prior to the placement of concrete. A summary of our observations and density tests taken today can be <br /> found in the attached Nuclear Density Gauge Data and Figure 1. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not indude supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 210 I Seattle,WA 98133 I 206.838.9900 <br /> q2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />