Laserfiche WebLink
INSPECTION REPORT <br /> �' Date /2 --Lf ermit: LI D /7..._e"...25 <br /> I' Contractor: <br /> IOwner: _ <br /> Site Address:--q--qlq / -i 5z....,TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> LI Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ P PPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION El <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> p /`./` 4 <br /> j� 7D2� <br /> Inspector: / Date: 2 ®/ -7 <br /> EIR(10/06) �/ DATABAR,INC. <br />