My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4512 29TH AVE SE 2019-03-15
>
Address Records
>
29TH AVE SE
>
4512
>
4512 29TH AVE SE 2019-03-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2019 8:34:36 AM
Creation date
3/15/2019 8:34:13 AM
Metadata
Fields
Template:
Address Document
Street Name
29TH AVE SE
Street Number
4512
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r' <br /> GEODESIGN FIELD REPORT <br /> Project Name: Everett River Front-Simpson Report: 099 <br /> GeoDesign#: Polygon-127-03 Date: 3/1/2018 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Clear, 40's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 0845/0915 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg, EIT <br /> El Site Plan(s) -V;44-m Density Test Summary Signature: Ori •- <br /> Attachments 0 Installation Records 0 Other Reviewed By: , <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg, was on-site part time at the request of Craig with DDS to <br /> observe foundation subgrade for Lot 201. <br /> SUMMARY OF OBSERVATIONS: <br /> Lot 201: <br /> Today, GeoDesign noted that DDS had completed backfilling the previously over-excavated area along the east end of the <br /> south perimeter foundation (30' L x 10'W x 0.5-1.5' D)with a 2-inch clean crushed rock material compacted into a firm and <br /> unyielding mass. <br /> Relative compaction of the gray-brown silty SAND with gravel subgrade was tested using a Troxler Moisture-Density <br /> Gauge; in-place density tests indicated that the soil had been compacted to greater than 95% of its maximum dry density as <br /> determined by a Modified Proctor analysis. <br /> It is the opinion of GeoDesign that exposed foundation subgrade observed today is currently suitable for support of the <br /> intended structure. GeoDesign recommends that any surficially loose and saturated material that may develop be removed <br /> from the base of foundation areas prior to the placement of concrete. Foundations should not be poured on frozen ground; <br /> any soils loosened from frost-heave should be removed from the base of foundation areas prior to placement of concrete. <br /> A summary of our observations can be found in the attached Figure 1 and Nuclear Density Gauge Data. The contractor was <br /> notified of our observations prior to our departure from the site today. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br /> tJ Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.