Laserfiche WebLink
V <br /> GEODESIGN z FIELD REPORT <br /> Project Name: Everett River Front-Simpson Report: 112 <br /> GeoDesign#: I Polygon-127-03 Date: 6/26/2018 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> =agr4MMOWN ‘„'7 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Clear, 60's <br /> Ron Bowen(Polygon) ' Eddy Stevens(Polygon) Arrival/Departure: 0900/0915 <br /> Distribution: __....__........______ ____ _.. _...:_..__...._........._ <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) ! Dave Foster(City of Everett) Prepared By Ben Weinberg, P.E. <br /> El Site Plan(s) m Density Test Summary Signature: 7%` - <br /> Attachments: 0 Installation Records 0 Other <br /> Reviewed By <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg,was on-site part time at the request of Craig with DDS to <br /> observe foundation subgrade for Lot 282. <br /> SUMMARY OF OBSERVATIONS: <br /> Lot 282: <br /> Previously, GeoDesign noted that DDS had over-excavated 1 to 1.5 feet of material on the southern portion of Lot 282 to <br /> expose firm and unyielding soil. Today,we noted that DDS had completed backfilling the area with a 2-inch clean crushed <br /> rock material compacted into a firm and unyielding mass. <br /> Relative compaction of the remaining exposed foundation subgrade was tested using a Troxler Moisture-Density gauge; <br /> in-place density tests indicated that the exposed material had been compacted to greater than 95%of its maximum dry <br /> density as determined by a Modified Proctor analysis. <br /> It is our opinion,that the exposed foundation subgrade observed today is currently suitable.for support of the intended <br /> structure.;GeoDesign recommends that any surficially loose and saturated material that may be generated be removed from <br /> the base of foundation areas prior to the placement of concrete. <br /> A summary of our observations and density tests taken today can be found in the attached Figure 1 and Nuclear Density <br /> Gauge Data. The contractor was notified of our observations prior to our departure from the site. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 L% <br />