Laserfiche WebLink
Project Name: Everett River Front-Simpson Report: 102 <br /> GeoDesign#• Polygon-127-01 Date: 8/02/2016 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW 1505-005 <br /> DFR 052 <br /> I Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather:Cloudy, 50's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1200/1330 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee((CityEverett) <br /> Ci of Dave Foster(City of Everett) Prepared By: Ben Weinberg, E.I.T. <br /> m Site Plan(s) m Density Test Summary Signature: �l <br /> Attachments: E Installation Records ❑ Other <br /> Reviewed By: <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg,was on-site at the request of Eddy Stevens with Polygon to <br /> observe foundation subgrade for Lot 114 <br /> SUMMARY of OBSERVATIONS' <br /> Lot 114: <br /> GeoDesign noted that the foundation subcontractor had excavated the footing and crawl space areas for Lot 114 prior to his <br /> arrival on-site. GeoDesign noted that the exposed footing subgrade consisted of a brown-gray silty SAND (f-m)with gravel <br /> (f-c)that had been exposed using a grade blade. The exposed foundation subgrade was evaluated using a 1/2 inch <br /> diameter soil probe and a Troxler Moisture-Density gauge. Penetration depths encountered ranged from 1 to 4 inches and <br /> in-place density tests indicated that the exposed foundation subgrade material had been compacted to greater than 95%of <br /> its maximum dry density as determined by a Modified Proctor analysis. A summary of our observations and density tests <br /> taken today can be found in the attached Nuclear Density Gauge Data and Figure 1. <br /> It is the opinion of GeoDesign that the exposed foundation subgrade observed today was currently suitable for support of <br /> the intended foundation load. GeoDesign recommends that any loose and saturated material be removed from the base of <br /> the foundation prior to the placement of concrete. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firth is not responsib'.e for site safety. This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By'section. <br /> 10700 Meridian Avenue North,Suite 210 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />