My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4320 29TH DR SE 2019-03-15
>
Address Records
>
29TH DR SE
>
4320
>
4320 29TH DR SE 2019-03-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2019 9:33:42 AM
Creation date
3/15/2019 9:33:38 AM
Metadata
Fields
Template:
Address Document
Street Name
29TH DR SE
Street Number
4320
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> Project Name: Everett River Front-Simpson Report: 106 <br /> GeoDesign# POI a on-127-01 Date 8/11/2016 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> DFR 052 PW15051005 <br /> ii•ii <br /> i/i�a r /'3'3333,333333/ii/i %o/i% 3"3;3,,, <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Mostly Sunny,60's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1030/1200 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Joe Westergreen: <br /> Attachments. 0 Site Plan(s) .: 0 Density Test Summary Signature: <br /> ® Installation Records It Other' , . <br /> , .. Reviewed ice*. <br /> PURPOSE of VISIT: GeoDesign representative,Joe Westergreen,was on-site at the request of Eddy Stevens with <br /> Polygon to observe foundation subgrade for Lots 112 and 113. <br /> SUMMARY of OBSERVATIONS: <br /> Lot 112: <br /> GeoDesign noted that the foundation subcontractor had excavated the footing and crawl space areas for Lot 112 prior to <br /> our arrival on-site. GeoDesign noted that the exposed footing subgrade consisted of a brown-gray silty SAND(f-m)with <br /> gravel (f-c)that had been exposed using a grade blade. The exposed foundation subgrade was evaluated using a 1/2 inch <br /> diameter soil probe and a Troxler Moisture-Density gauge. Penetration depths encountered ranged from 1 to 2 inches and <br /> in-place density tests indicated that the exposed foundation subgrade material had been compacted to greater than 95%of <br /> its maximum dry density as-determined by a Modified Proctor analysis. A.summary of our observations and density tests <br /> taken today can be found in the attached Nuclear Density Gauge Data and Figure 1. <br /> It is the,opinion of GeoDesign that the exposed foundation subgradeobserved today was currently,suitable for support of <br /> the intended foundation load. GeoDesign recommends that any loose and saturated material be removed from the base of <br /> .,,,.alae foundatiora_pi;ior touthe,,placer lent.bf,.concrete ,.. m _ _,.,. . ;, ,,,,,,,, <br /> Lot"113: <br /> GeoDesign noted that the foundation subcontractor had excavated the footing and crawl space areas for Lot 113 prior to, <br /> our arrival using a Komatsu PC120 excavator with a grade blade. GeoDesign noted that the exposed footing subgrade <br /> consisted of a brown-gray silty SAND (f-rn)with gravel (f-c). The exposed foundation subgrade was evaluated using a 1/2 <br /> inch diameter soil probe and a Troxler Moisture-Density gauge. Penetration depths encountered ranged from 1 to 2 inches <br /> and in-place density tests indicated that the exposed foundation subgrade material had been compacted to greater than <br /> 95%of its maximum dry density as determined by a Modified Proctor analysis. A summary of our observations and density <br /> tests taken today can be found in the attached Nuclear Density Gauge Data and Figure 1. <br /> It the opinion of GeoDesign that the exposed foundation subgrade observed today was currently suitable for support of <br /> the intended foundation load. GeoDesign recommends that any loose and saturated material be removed from the base of <br /> the foundation prior to the placement of concrete. <br /> • <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specificationsthroughout the duration of the project irrespective of the presence of our representative,Ourwork does not include supervision or direction of the contractor,the contractor's employees ._,_ <br /> or agents.Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations;The report can only be considered ., <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 210 I Seattle,WA 98133 I 206.838.9900 / <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 ofir <br />
The URL can be used to link to this page
Your browser does not support the video tag.