Laserfiche WebLink
, <br /> I IF THIS PLAN IS NaT QN 22x34 PAPER, IT HAS BEEN SCALED AC�ORDINGLY <br /> Code Referenees: <br /> _� � . <br /> R807 Attic Access: � � � � � <br /> ATTIC VENTI NG REQU I REM ENTS Buildings with combustible ceiling or roof construction sha11 have an aitic aecess opening to attic areas � W .�, w � ,1, <br /> t h a t h a v e a v e r t i c a l h e i g h t a f 3 0-i n c h�s(7 6 2 m m}o r g r e a t e r a v e r�n�r e a v f n o t l e s s t h a n 3 Q-s q u a r e f e e t � � a Q Q o , <br /> TOTAL NEW ATTIC AREA: 244.00 sqft = 1�150 (�,8 rti2).The vertical height shall be measured from the tvp oE the ce3ifing framing members to the � � e � � m <br /> unc9erside of the roof framing members. � �� ,'X <br /> RE UIRED VENTING AREA: = 234.36 s in � � .� M .� <br /> , V600E (20sqin/11f}; 12�—O�X2Q = 240.00 sqin Ttie raugh-framed opening shalf be not(ess than 22-inches fay 30-inches(559mm by 762mm}and sha({ � W � o� � p <br /> RS400 18.75s In e : 12x18.75 = + 225.00 S in be located in a hai{way or other rea�.lily accessibfe location.Where iocated in a wall,the opening shaU be � Q o m� a <br /> nof less than 22-inches wide by 30-inches high(SS9mm wide by 762mm highj.Where the access is � o � ° "' <br /> TQTAL PROPOSED VENTING AREA: 465.00 sqin located in a ceiling,minimum unabsYructed headraom in the attic space shall be 30-inches{762mm)at � Q `J' �N" <br /> some point abave the access measured vertically from thQ bottom of ceiling framing members.See — o <br /> 5ection M1345.1.3 for access requirements where mechanical equipment is(ocated in attics. j�r�f � <br /> .�_������ � . <br /> � <br /> , �� <br /> � <br /> �-- \� <br /> �� ', \,\ <br /> \\ �\ <br /> \� `�\ <br /> � \ <br /> � <br /> v <br /> c � c � <br /> a� � cv <br /> c � � �' c � <br /> •` � C � � �� <br /> � 0 5:12 � 0 5:12 Q � <br /> l� o � o Q l� <br /> � <br /> v�i � > v�i <br /> � � � <br /> N <br /> QJ � Q! <br /> � Create attic access `� <br /> through existing gable ' <br /> , � , <br /> ti <br /> � <br /> 5:12 ��, 5,12 w <br /> � o <br /> -a � <br /> � ,,, <br /> Gutterline � � <br /> � <br /> O <br /> � � <br /> � <br /> N <br /> � <br /> � Q <br /> � m <br /> 5:12 <br /> � o <br /> �� N <br /> �Z`� r- 00 <br /> I `` � � �' ¢ <br /> � '� :�= `i' o i-�- <br /> I �3 v � � <br /> � � c m <br /> Q � � � <br /> � � � <br /> u '�` ' W <br /> � � � � <br /> � � a� <br /> a� <br /> � � � � <br /> �, Ric� eline cn W <br /> � � <br /> � � <br /> ' � o <br /> !!'� o <br /> a� o <br /> 0 <br /> 0 <br /> � a <br /> � � <br /> 0 <br /> O <br /> O <br /> . 9�/�� N � �� . <br /> � vi v <br /> 5:12 5:12 � < <br /> Plan Tide <br /> I Prr�pased <br /> � , _ <br /> Roof Plan <br /> I - • <br /> Gutterline <br /> Dra�vn <br /> Douglas Almond <br /> � Date <br /> I . <br /> 07/1Q/2017 <br /> � <br /> � P/an Revisions <br /> O � <br /> O � <br /> O <br /> O <br /> O - <br /> PLAN O - . <br /> NORTH a - ' <br /> PLAN$ EXAMINER APPROVAL: <br /> Sheet: <br /> Proposed Roof Plan <br /> _—'. �-� — !�� <br /> Scale; 1/4"=1'-0° <br /> oi: — <br />