My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/03/13 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/03/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2019 10:32:00 AM
Creation date
3/19/2019 10:31:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Final Acceptance&Certificate Briefing COUNCIL BILL# <br /> of Completion with McClure Proposed Action Originating Department Public Works <br /> & Sons,Inc. for the Three Consent Contact Person Keith Alewine <br /> Lakes Valve Bypass Project. Action Phone Number 425/257/7225 <br /> First Reading FOR AGENDA OF March 13,2019 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department ea4L 1 <br /> Administration f <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> 3 Lakes-Snohomish CO No. 2 8/22/2018 Final Contract Voucher Public Works <br /> Certificate of <br /> Completion,Final <br /> Estimate,Vicinity Map <br /> Amount Budgeted $1,500,000.00 Fund 336 <br /> Expenditure Required $0 Account Number(s): UP-3611 <br /> Budget Remaining $193,171.86 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> This project provided a 36-inch steel pipe bypass around the Three Lakes Valve that will allow maintenance on the <br /> existing valve structure without shutting down the 51-inch Transmission Line No. 5. This work included the <br /> installation of a COE provided 36-inch pressure sustaining valve within a Contractor provided cast-in-place concrete <br /> _ vault,along with miscellaneous water appurtenances. <br /> The General Contractor,McClure& Sons,Inc. completed the Three Lakes Valve Bypass project in accordance with <br /> the project's plans and specifications and to the satisfaction of the City of Everett Public Works Department. <br /> The final Contract amount due McClure&Sons,Inc. amounts to $1,306,828.14,which includes Washington State <br /> Sales Tax. The Contractor provided a retainage bond in lieu of retention being withheld. In order to release the <br /> retainage bond,the City of Everett needs to accept the project and authorize the Mayor to sign the Certificate of <br /> Completion. <br /> RECO1VI11IENDATION(Exact action requested of Council): Accept the Three Lakes Valve Bypass project with <br /> McClure&Sons,Inc.as complete and authorize the Mayor to sign the Certificate of Completion, allowing the release <br /> of the retainage bond. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.